7.5
Gas connection
Caution
Make sure that the gas supply pipe has the correct diameter and length to supply
sufficient capacity to the water heater.
Caution
Make sure that the gas supply pipe is clean. Contamination in the pipe can cause damage
to the gas control valve, during operation.
Caution
Install the manual gas valve on a spot accessible for the user.
Install the gas connection:
Install a manual gas valve (10) in the gas supply pipe.
Make sure that the gas pipe is clean before use. If necessary, remove the
contamination from the pipe.
Close the manual gas valve.
Install the gas supply pipe to the gas control valve.
Make sure that there are no gas leaks.
7.6
Venting system
There are several alternatives for installation of the air inlet and flue gas outlet:
Installation
type
Version
Description
B23
Open
Air for combustion is drawn from installation room
and the flue gasses leave the water heater via a
vertical roof terminal.
C13
Closed
Concentric and/or parallel venting system, with
horizontal air inlet and flue gas outlet, in same
pressure zone.
C33
Closed
Concentric and/or parallel venting system, with
vertical air inlet and flue gas outlet, in same
pressure zone.
C43
Closed
Water heaters on common air inlet and flue gas
outlet (concentric and/or parallel) in a multiple
floor building.
C53
Closed
Separate air inlet and flue gas outlet terminal
types mixed. Air inlet and flue gas outlet
termination may be in different pressure zone.
C63
Closed
Water heaters supplied without venting materials.
These water heaters must be installed in
compliance with local regulations. The water heater
is intended to be connected to a separately
approved and marketed venting system.
This manual does not discus installation type B23. When you need a B23 system, contact
A.O. Smith for more information.
Caution
Always make sure that the flue gas outlet discharges into an area approved for the
correct type of installation.
Caution
The use of a different wall or roof terminal can result in incorrect functioning of the water
heater. Use the part number from the table to order a terminal set from your supplier or
the manufacturer.
c
1.
2.
3.
4.
5.
c
58
Installation, Maintenance and Service part
Содержание BFC Cyclone
Страница 6: ...6...
Страница 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41...
Страница 42: ...42 User part...
Страница 46: ...46 Installation Maintenance and Service part...
Страница 52: ...52 Installation Maintenance and Service part...
Страница 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59...
Страница 76: ...76 Installation Maintenance and Service part...
Страница 78: ...78 Installation Maintenance and Service part...
Страница 84: ...84 Installation Maintenance and Service part...
Страница 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part...
Страница 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part...
Страница 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part...
Страница 113: ......
Страница 114: ......
Страница 118: ...116 Installation Maintenance and Service part...