Introduction
8
Instruction manual ADM
1
gis
The installation should also be in accordance with any relevant requirements of
the HSE, local gas region and local authority and the relevant recommendations
of the following documents:
British Standards
•
BS 6891:
Specification for installation of low-pressure gas pipework of up to
28 mm (R1) in domestic premises (2nd family gas). For larger installations,
see IGE/UP/2 below.
•
BS 6798:
Specification for installation of gas-fired boilers of rated input not
exceeding 70 kW net.
•
BS 6644:
Specification for installation of gas-fired hot water boilers of rated
inputs between 60 kW and 2 MW (2nd and 3rd family gases).
•
BS 6700:
Specification for design, installation, testing and maintenance of
services supplying water for domestic use within buildings and their
associated premises.
•
BS EN 806-2:
Specification for installations inside buildings conveying water
for human consumption. Part 2: Design.
•
BS 5546:
Specification for installation of hot water supplies for domestic
purposes, using gas-fired appliances of rated input not exceeding 70 kW.
•
BS 5440:
Installation and maintenance of flues and ventilation for gas
appliances of rated input not exceeding 70 kW net (1st, 2nd and 3rd family
gases). Part 1: Flues. Part 2: Ventilation.
Institute of Gas Engineers and Managers Publications
•
IGE/UP/1 Soundness testing and purging of industrial and commercial gas
installations.
•
IGE/UP/1A Soundness testing and direct purging of small low-pressure
industrial and commercial natural gas installations.
•
GE/UP/2 Gas installation pipework, boosters and compressors on industrial
and commercial premises.
•
IGE/UP/10 Installation of gas appliances in industrial and commercial
premises. Part 1: flued appliances.
CIBSE Publications:- "CIBSE Guide"
Section B4:
Water Service Systems.
1.4
Target groups
The three target groups for this manual are:
•
(end) users;
•
installation engineers;
•
service and maintenance engineers.
Symbols on each page indicate the target groups for whom the information is
intended. See the table.
Target group symbols
Symbol
Target group
(End) user
Installation engineer
Service and maintenance engineer
Содержание ADM - 40
Страница 4: ...4 Instruction manual ADMP gis...
Страница 32: ...Installation 32 Instruction manual ADM 3 is...
Страница 36: ...Conversion to a different gas category 36 Instruction manual ADM 4 is...
Страница 42: ...The control panel 42 Instruction manual ADM 7 gis...
Страница 44: ...Status of the appliance 44 Instruction manual ADM 8 gis...
Страница 46: ...Starting and running 46 Instruction manual ADM 9 gis...
Страница 48: ...Shutting down 48 Instruction manual ADM 10 gis...
Страница 59: ...Instruction manual ADM 59 is 14 Appendices 14 1 Introduction This section gives the electrical diagram...
Страница 62: ...Appendices 62 Instruction manual ADM 14 is...
Страница 64: ...0311 812 1 1 UK Index Instruction manual ADMP...