Set Up And Operation(Applicable To All Models)
ASSEMBLY AND OPERATION
This kit is intended for use on A-ipower lnverter
Generators.
Please refer to your Inverter Owner's Manual forsafety
rules, start up and shut down procedures,specifica-
tions and troubleshooting.
5. Turn on both inverters. See inverter owner’s manual
for starting instruction.
lf not spaced apart, the exhaust heat from one unit
may discolor or melt the plastic on the other unit.
2. Inverters to be TURNED OFF and all electrical loads
DlSCONNECTED before installing parallel kit.
NOTE:
Do not connect or disconnect the parallel kit
while the inverters are running.
3. The low idle switch(button) must be in the same
position (ON or OFF) on both generators.
4. On each inverter:
4.1 Remove the parallel outlet covers. Plug the black
and red parallel cable terminals to the black and red
parallel outlet (black to black and red to red) on
each corresponding inverters control panel. Do not
plug two red cables or two black cables into the
same inverter.
4.2 Loosen nuts on grounding terminals and attach
round wire to ground terminal in each inverter.
Tighten securely.
3
1. Align the two inverters on a firm, flat and level
surface at a minimum 20 inch apart.
WARNING
If not spaced apart, the exhaust heat
from one generator discolors or melt
the plastic shell on other generator.
20”
5
b. Recoil start
Pull recoil starter slowly until resistance is felt,
then pull rapidly.
5a. Electric start
T
urn and hold the ENGINE START/STOP
switch for 5 seconds until the engine start.
Parallel Cable
Terminals
Parallel
Outlets
Grouding Wire
Содержание PK12000
Страница 13: ...Fontana CA 92337 USA Phone 855 888 3598 support a ipower com www a ipower com ...
Страница 26: ...Fontana CA 92337 EE UU Teléfono 855 888 3598 support a ipower com www a ipower com ...
Страница 39: ......
Страница 40: ...Fontana CA 92337 USA Téléphone 855 888 3598 support a ipower com www a ipower com ...