CV Express
build guide
version 1.0
image on the pcb, all of the sockets point upwards.
Next, Install the two PTC fuses, these go in the two places marked 0.1a just above the power header,
December 2015
13
CV Express
build guide
version 1.0
image on the pcb, all of the sockets point upwards.
Next, Install the two PTC fuses, these go in the two places marked 0.1a just above the power header,
December 2015
13