
BACK - EXPLODED ISO VIEW
5091-909S
NUT HEX .250-20
5091-154
5091-155
CR-RHMS .25-20 x .50
5091-171
NUT HEX .250-20
5091-912
NUT HEX .250-20
Washer Lock .250
Washer Flat .250
Washer Flat .250
Washer Lock .250
Washer Flat .250
Washer Lock .250
socket head cap screw
5091-157
Washer Flat .190
Washer Lock .190
CR-PHMS .138-32 x .25
Washer Flat .190
5091-216
5091-148
5091-147
DAMPER - EXPLODED ISO VIEW
Maintenance
1. Normal cleaning should be all that is necessary. Make sure to clean the radiant heat tubes with the scraper rod and wrench handle every day.
This is a 30 second procedure.
One time a year the Lower Combustion motor should be removed and cleaned. The blades will have buildup on them from regular burning. This
buildup needs to be removed and cleaned by a professional and the motor re-installed, making sure all nut fasteners and lock washers are used for
re-install and tightened down securely. Do not over-tighten the nuts. If the gasket is damaged, it should be replaced to prevent air leaks.
With the combustion motor removed, inspect your chimney pipe inspected for debris, and have it cleaned by a professional at this time if needed.
When it is re-installed make sure that all connections are re-sealed and secure.
Содержание 509-1 OPTIMUM
Страница 2: ...MODEL 509 1 OPTIMUM ...