5.5 Transferring the tank to the pit and backfilling
Suitable equipment should be used to move the tanks gently into the prepared pit. Deformations are elim-
inated when the tanks are filled to a third of their depth with water and checked for leaks before the pit is
filled.
The underground tank must be surrounded with a suitable filling material. Unsuitable or inadequately pro-
cessed filling material might cause damage to the tank and form cavities.
The filling material must:
•
be free of sharp or pointed parts and objects
•
be well and uniformly permeable to water
•
be easily compactable and form a tight packing around the underground tank
We recommend as the filling material round gravel with a max grain size of 8/16 mm. Round gravel need
not be compacted.
Lay the surround in successive depths no greater
than 300 mm until it reaches the tank’s top edge.
Compact each layer carefully using a hand tamper.
Mechanical compacting machines must not be
used under any circumstance. Observe the mini-
mum width of the side surround as set down in
Tab. 7.
Important:
Make sure that the filling material fully
surrounds the tanks and that it can be compacted
easily at the connecting points and inter-tank cavi-
ties. Use chips for FLAT tank (max grain size
2/5 mm)!
Tank
Minimum surround width
FLAT S/M/L
100
mm
MODULARIS
500
mm
COMPACT
500
mm
PROFI
500 mm
Tab. 7: Minimum side filling width – FLAT,
MODULARIS, COMPACT, PROFI
Fig. 27: Insertion and filling – FLAT
Fig. 28: Inter-tank cavities – FLAT
Fig. 29: Insertion and filling – MODULARIS
Fig. 30: Insertion and filling – COMPACT, PROFI
100 mm
Filler layer
Filler layer
500 mm
500 mm
Filler layer
Содержание FLAT
Страница 102: ...102 104 Notizen Notes Notas...
Страница 103: ...103 104...
Страница 104: ...104 104 943534 1 4 023122 287070...