4iiii PM100 Скачать руководство пользователя страница 7

4iiii Innovation Inc. 

Model: PM100

 

Appendix I 

 
How to install the battery of the precision

TM

 power meter PM100 

 

 

 
1. Turn the back cover of the product anti-clockwise to unlock it and take it off. 

 

2. Remove the used battery and install new battery. 
3. Fix the back cover to the product. 

Содержание PM100

Страница 1: ... Quick Start Guide ...

Страница 2: ...or more information go to www 4iiii com legal policies Head Office 228 River Avenue Cochrane AB Canada T4C 2C1 1 403 800 3095 www 4iiii com Technical support available from 4iiii by email from 9am 5pm Mountain Time Email support 4iiii com Copyright by 4iiii Innovations Inc All rights reserved Text text excerpts images and diagrams are all subject to copyright No part may be reproduced or copied wi...

Страница 3: ...the pod to temperatures above 50 C or 122 F 11 Do not install the pod on uneven or curved surfaces on the crank arm 12 Do not install this power meter pod on carbon fiber crank arms 1 2 Clearance Check Make sure there is enough room between the crank arm and the bicycle frame to install the PrecisionTM power meter pod A minimum of 2 mm or 3 32 inch of space is present between the PrecisionTM pod a...

Страница 4: ... accuracy of the power meter 1 2 2 Using Installation Tool and Installation Band Place and hold the metal plate of the PrecisionTM pod on the crank arm as shown in section 1 2 1 and secure the pod on the crank arm using the provided installation tool and installation band Pull the installation band around the crank arm and attach them to the hooks on the pod Slide the installation tool under the b...

Страница 5: ... the PrecisionTM power meter on your crank arm ensure the pod has the necessary clearance for the bicycle as shown in igure 1 2 in section 1 Once a suitable lo cation for the pod has been found mark the install location as shown in section 1 2 4 2 2 Preparing Crank Surface Before the PrecisionTM pod can be adhered to the crank arm the crank arm surface must be sanded and thoroughly cleaned Do not ...

Страница 6: ...on your crank arm 2 3 5 Fix Pod on Crank Arm Place and hold the PrecisionTM pod on the install location as marked on the crank arm in section 1 2 1 and secure the pod on the crank arm using the provided installation tool and installation band Pull the installation band around the crank arm and attach them to the hooks on the pod Do not attempt to clean off the excess epoxy with any solvents doing ...

Страница 7: ...endix I How to install the battery of the precisionTM power meter PM100 1 Turn the back cover of the product anti clockwise to unlock it and take it off 2 Remove the used battery and install new battery 3 Fix the back cover to the product ...

Страница 8: ...nsult the dealer or an experienced radio TV technician for help This device complies with Part 15 of FCC Rules Operation is subject to the following two con ditions 1 This device may not cause harmful interference and 2 This device must accept any interference received including interference that may cause un desired operation Note The manufacturer is not responsible for any radio or TV interferen...

Страница 9: ...nement Declaration of Conformity 4iiii Innovations Inc declares that this product is in compliance with the essential requirements and other relevant provisions of Directive 1999 5 EC To view the full Declaration of Conformity go to www 4iiii com compliance Limited Warranty This product does not contain any user serviceable parts For more information go to www 4iiii com legal policies ...

Отзывы: