15
•
Slide the side bearing with universal bearing onto the support tube & fasten.
>
fig. 3.9
•
Ensure that the motor square spigot is properly engaged in the universal bearing.
>
fig. 3.10
•
Secure the motor square spigot with the supplied cotter pin.
>
fig. 3.11
•
Attach the cover to the side bearing.
>
fig. 3.12
•
Install awning & release fuses.
4
Awning motor wiring:
•
Connect the awning motor and switch (or timer) to the mains.
•
The electrical connection of the awning motor and control may only be carried out by qualified personnel.
•
If the drive should run in the opposite direction after installation, the motor’s upstream and downstream leads (brown + black) must be turned.
3.9
3.10
3.11
Side bearing &
Universal bearing
Support tube
Cotter pin
Side bearing
Cover
3.12
Awning motor
230 V / 50 Hz
INSTALLATION INSTRUCTIONS
3T-MOTORS Tubular motors
| Installation instructions
Power grid
230 V / 50 Hz
1) brown / black = L1 / Phase
2) blue = N Neutral conductor
3) green/yellow = PE Protective conductor
1) black = Departure or ascent
2) brown = Departure or ascent
3) blue = N Neutral conductor
4) green/yellow = PE Protective conductor
2 (N)
1 (Up/Down)
2 (Up/Down)
3 (N)
4 (PE)
3 (PE)
1 (L1)