background image

9

Pull out the fixed battery groove (located on the upper right of the battery).

After completing the above operations, as shown in the figure below.

Содержание VT-10 Pro

Страница 1: ...VT 10 Pro 10 Inch Rugged Android Vehicle Display Terminal User Manual Version 1 0 1 ...

Страница 2: ...he part of the manufacturer Under no circumstances will the manufacturer be liable for any direct indirect special incidental or consequential damages arising from the use or inability to use the product or documentation even if advised of the possibility of such damages About This Manual This user s manual provides the general information and installation instructions for the product The manual i...

Страница 3: ...ing Battery Life 10 2 4 Installing Micro SD and SIM Card 11 Chapter 3 Using VT 10 Pro Hardware Interface 12 3 1 Transferring Files between Computer and the Device 12 3 1 1 Connection 12 3 2 Using Serial Port Demo App 13 3 3 Using ACC 14 3 3 1 ACC Connection Instruction 14 3 3 2 ACC Functions 14 3 3 3 ACC Settings Path 15 3 3 4 ACC Settings 15 3 4 Using GPIO 18 3 4 1 GPIO Tail Lines Instruction 18 ...

Страница 4: ...s symbol of CAUTION indicates that there is a danger of injury to the user or a risk of damage to the product should warning notices be disregarded Battery Recycle This symbol indicates electrical warning Important Safety Instructions Read these safety instructions carefully Read all cautions and warnings on the equipment Place this equipment on a reliable surface when installing Dropping it or le...

Страница 5: ... equipment when charging the equipment for the first time Long Term Storage Maintenance If you are putting away the battery for more than three months it is recommended that the battery should be stored separately and fully charged and get recharged every three months If you store an uncharged battery it could fall into a deep worn out state which would render it incapable of holding any charge Be...

Страница 6: ...orization must be obtained from the vendor before returned merchandise will be accepted Authorization can be obtained by calling or emailing the account representative from vendor and requesting a Return Merchandise Authorization RMA number Returned goods should always be accompanied by a clear problem description ...

Страница 7: ...ation System Comply with IP67 rating WIFI Bluetooth LTE GNSS and 8000 mAh rechargeable battery supported 10 Inch IPS Display physical 1280x800 resolution 1000 cd m multi point capacitive touch Portable with Docking Station Comply with IP67 rating Comply with MIL STD 810G Fingerprint 1D 2D scanner 1 2 Parts of the Device ...

Страница 8: ... 0 30 V Note With ACC function the device is requested to connect the power source via DC adaptor simultaneously to power on after ignition please refer to 3 3 for the DEMO and source code of ACC 4 Power DC input Voltage DC 8 36 V ISO 7637 2 compliant 5 GPIO 1 2 3 4 5 Input 1 Input 2 Output 1 Output 2 GND 6 USB USB Type A can t be used simultaneously with USB Type C on the device ...

Страница 9: ... ACC function the device is requested to connect the power source via DC adaptor simultaneously to power on after ignition please refer to 3 3 for the DEMO and source code of ACC 4 GPIO 1 2 3 4 5 Input 1 Input 2 Output 1 Output 2 GND 5 USB USB Type A can t be used simultaneously with USB Type C on the device 6 Power DC input Voltage DC 8 36 V ISO 7637 2 compliant ...

Страница 10: ...egapixel camera Bluetooth 2402 MHz 2480 MHz Integrated Bluetooth 4 2 LE EDR class 2 with HID A2DP AVRCP BIP BPP FTP HFP HSP OPP SPP supported WLAN 802 11 a b g n ac 2 4 GHz 5 GHz Support Wake on WLAN WoWLAN Support ad hoc mode Support WAPI SMS4 hardware encryption Support AP mode Support Wi Fi Direct Support MCS 0 7 for HT20 and HT40 WWAN US Version North America LTE FDD B2 B4 B5 B7 B12 B13 B14 B1...

Страница 11: ...tional All major 1D barcodes PDF417 QR Code M1 M2 Micro and Data Matrix etc Fingerprint optional Capacitive area sensor Sensor Acceleration sensors Ambient light sensor Gyroscope Compass Power DC 8 36 V ISO 7637 II compliant Battery 3 7V 8000 mAh Li ion Replaceable Battery Operating time about 4 hours typical Battery charging time about 6 hours Physical Dimensions 277 185 31 6 mm Weight 1357 g Env...

Страница 12: ...l and the signal strength Bluetooth Long press to open the display Bluetooth settings select the Bluetooth name of the device you want to transfer to connect after the connection is successful you can send and transfer files Do not disturb Turn it on and enter Do Not Disturb mode The product is in a silent state no notification is displayed and no notification sound is emitted Automatic rotation C...

Страница 13: ...factory for repair 2 1 1 Power on the Device 1 Power on by pressing the button Long press the power button for more than 2 seconds until the boot screen displayed It needs around 25 seconds to start the system The indicator is on when VT 10 Pro activate normally 2 Power on by connecting ACC see the details in Chapter 3 3 Using ACC 3 Power consumption during operation 9 6W typical 2 1 2 Power off t...

Страница 14: ...removing the battery Icon introduction 1 The switch is on the left lock the machine state lock the battery 2 The switch is on the right to unlock the machine status and the battery can be removed 3 In the direction of the arrow push the indicated skateboard up The specific operation methods of installation and removal are as follows To lock the battery status switch turn it to the left When you wa...

Страница 15: ...9 Pull out the fixed battery groove located on the upper right of the battery After completing the above operations as shown in the figure below ...

Страница 16: ...ay cause the warranty invalid 2 2 2 Checking the Battery Level a When the charging is in process a battery indicator will appear in the status bar showing the charging percentage To view the charge percentage swipe down the Status Bar and you will see the charging percentage b When the battery is fully charged you can disconnect the DC input If available please keep the device in charging by DC po...

Страница 17: ...wer device temperature To access the battery settings page swipe down the Status Bar in the upper right corner and then tap and hold the Battery icon 2 4 Installing Micro SD and SIM Card Before installing the SIM card and TF you need to remove the tablet battery After disassembly please insert the required card into the machine in the direction indicated in the figure below Finally load the batter...

Страница 18: ...ter and the Device You can transfer files such as pictures or audio files between your computer and your device using the provided USB cable 3 1 1 Connection Connect the device to the computer by using the USB type c cable and open the prompt message of the device Select File Transfer ...

Страница 19: ...box to select corresponding COM port Baud rate 4 The right box in red means COM port switch to switch on off corresponding COM port 5 The boxes in red means auto send interval time setting 6 The boxes in red means auto send mode selection and COM port info sending button 7 COM port info sending button 8 The boxes in red means text rows counting in the information receiving text box the above numbe...

Страница 20: ...ded cable of the tablet with ACC of vehicle 3 3 2 ACC Functions I Power on the tablet by ACC II Light up the screen by ACC III To turn off the screen by ACC trigger based upon the setting delayed time IV To shut down the tablet by ACC trigger based upon the setting delayed time Note a The ACC is triggered by the electric level b Function of Power on the tablet by ACC can t be modified from the sys...

Страница 21: ... ACC Settings Path Find ACC Settings from Settings as the Figures shown 3 3 4 ACC Settings ACC Settings Path Settings ACC Settings Note The following text description corresponds to the red number in the figure ...

Страница 22: ...off the screen function 3 Click to pop up the dialog box in Figure to set the delay time to turn off the screen display after ACC is disconnected 4 Display current delay time 5 ACC controls switch to turn off the tablet 6 After clicking the dialog box shown in Figure to set the delay time for shutdown after ACC is disconnected 7 Display current delay time ...

Страница 23: ...17 ...

Страница 24: ...of inductive load of motor relay and so on be sure to use the clamp diode externally Typical relay connection 3 3 3 GPIO_DEMO Instruction a Introduction This software is only used for developing GPIO functions of device and it isn t suitable for factory s standard software b GPIO_DEMO Main Interface GPIO 1 2 3 4 5 Input 1 Input 2 Output 1 Output 2 GND GPIO36 GPIO42 GPIO3 GPIO24 Digital input posit...

Страница 25: ...ure 1 Name means the port names of GPIO 2 Direction means the input or output direction of the ports 3 State means the current level state of the GPIO ports The button marked with a red box shown in Figure It can read the value at once when GPIO is set as the input direction ...

Страница 26: ...20 The button marked with a red box shown in Figure used to set the high or low of GPIO output at once ...

Страница 27: ...21 3 5 Using NFC Function 3 5 1 NFC Activation Method Activate the NFC function according to Figure ...

Страница 28: ... prompt tone would be heard if the card is successfully identified If the card contains some information such as manufacturer s information there will be an interface popped up as shown in figure Note If the card has been identified it does not always pop up an interface but there must be a prompt tone ...

Страница 29: ...23 3 6 System Root Switch Usage Guide 1 Refer to the following figure to enter the Root privilege on off function setting interface ...

Страница 30: ...The root switch setting interface is as follows In the figure 1 is the Root permission on off switcher 2 to modify the password Initial password qwertyuiop 3 The dialog box to set the Root Permissions on off ...

Страница 31: ...re the factory settings the root switch state will be reset to OFF and the password is restored to the initial Chapter 4 Docking Station Using Instruction 4 1 Docking Station Install Steps 1 Insert the key and turn it 90 degrees to the right to unlock the key to unlock the telescopic buckle as Fig 4 1 shown ...

Страница 32: ...26 Fig 4 1 2 Align the VT 10 Pro to the limit slot of docking station as Fig 4 2 shown Fig 4 2 3 the buckle up as the Fig 4 3 shown ...

Страница 33: ...27 Fig 4 3 4 Push VT 10 Pro to make it attached the docking via snap joint as Fig 4 4 shown Fig 4 4 5 Release and finish the installation as Fig 4 5 shown ...

Страница 34: ...n Disassemble Steps 1 Stretch upwards the buckle to release it from the device as Fig 4 6 shown Fig 4 6 2 Take out the device as Fig 4 7 shown Fig 4 7 3 Hold down the key and rotate 90 degrees to the locked sign pull out the key to ...

Страница 35: ...29 lock the telescopic buckle as shown in Fig 4 8 Fig 4 8 ...

Страница 36: ...s 5 1 Accessories Allen Wrench 1pc Screws for RAM 4pc USB to Type C cable 1pc DC 12V 1pc battery cover crowbar 1pc 5 2 Optional accessories 1 J1939 female to open cable 1 pc 2 OBD II female to open cable 1 pc 3 RAM 101U 1 pc ...

Отзывы: