- 3 -
10/100Base-T(X) MDI-X (Cross over cable)
Gigabit MDI (straight-through cable)
Gigabit MDI-X (Cross over cable)
MDI/MDI-X auto connection makes switch easy to use for
customers without considering the type of network cable.
1000Base SFP fiber port(mini-GBIC)
1000Base-X SFP fiber port adopts Gigabit mini-GBIC
transmission, can choice different SFP module according to
different transfer distance. Fiber interface must use for pair,
TX port is transmit side, must connect to RX (receive side).
The fiber interface support loss line indicator.
Suppose
: If you make your own cable, we suggest labeling
the two sides of the same line with the same letter (A-to-A
and B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
LED Indicator
LED indictor light on the front panel of product, the function
of each LED is described in the table as below.
System indication LED
LED
State
Description
P1
ON
Power is being supplied to
power input PWR1
OFF
Power is
not
being supplied to
power input PWR1
P2
ON
Power is being supplied to
power input PWR2
OFF
Power is
not
being supplied to
power input PWR2
Alarm
ON
When the alarm is enabled,
power or the port’s link is
inactive.
OFF
Power and the port’s link is
active, the alarm is disabled.
Run
ON/OFF
System is not running well
Blinking
System is running well
Link/ACT
(G1~G20)
ON
Port connection is active
Blinking
Data transmitted
OFF
Port connection is not active
Installation
Before installation, confirm that the work environment meet
the installation require, including the power needs and
abundant space. Whether it is close to the connection
equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat
fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation
requirements.
3. Examine whether the cables be seemly or not (less than
100m) according to reasonable scheme.
4. Power: support 48VDC power supply
5. Environment: working temperature: -40
75
Storage Temperature: -40
85
Relative humidity 5%
95%
DIN Rail Installation
In order to use in industrial environments expediently, the
product adopt 35mm DIN-Rail installation, the installation
steps as below:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position is
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as
shown below.
Wiring Requirements
Cable laying need to meet the following requirements: