Page 15
3M
™
Straight Line Laminator Single Head Manual
|
Original Assembly and Operation Instructions
Effective: August 2022
4.5.2 Application process SGA 500 L with Product Guide
Figure 7
1 . The unit is set up according to chapter
6.2 Setting Up the Unit
.
2 . Loosen the locking bolt (Figure 7C) and pull the hand lever (Figure 7D) upwards .
The swivel lever with the application roller (Figure 7D) swivels down. The unit is ready.
3 . Guide the product to be bonded over the right side onto the set-up product guide (Figure 7A) under
the application roller (Figure 7D) and push it further down the roller conveyor . Always repress the
beginning of the adhesive tape on the first .
The compression spring holds the application roller down and thus ensures the application of the
adhesive tape to the product surface.
4 . Push a second product on the roller conveyor and pass both of them under the application roller .
As soon as the first product is a little behind the application roller, cut the adhesive tape between
the two products .
NOTE: Danger in the area when cutting the tape.
Danger of cutting .
Wear protective gloves . Do not reach into the blade .
5 . Push another product on the roller conveyor so that the second product with the tape applied is
behind the application roller and proceed as described above .
6 . Pull the hand lever (Figure 7B) down when you finish the process in order to lift the application roller
and to fix the locking bolt again .
The swivel lever with the application remains in the upper position. The unit is not ready.
C
B
A
D