78-8122-3169-0-F
29
15.2 While holding the jumper wires in place, close the
cap and press to snap latch firmly into place.
15.3 Route jumper wires to distribution pair through
wire loops on block ends and through vertical and
horizontal wireways. Cut jumper wires to appropriate
length, leaving at least 5 cm (2 inches) of slack.
15.4 Terminate the jumper wires to the distribution pair by
repeating the procedure described in steps 15.1 and
15.2.
15.5 Terminate additional jumper wires by repeating the
above procedure.
15.6 To remove jumper wires, open the cap and pull wires
straight out from block.
16.0 Accessories Installation of the 3M
™
Quick Connect System (QCS)
2810 Blocks
16.1 Plug the 3M
™
Pair Test Probe 2827 into the cap of
the pair being tested, with the black lead to the left
and the red lead to the right.
16.2 To install Priority Circuit Markers, place over the
jumper cap of the pair to be marked and push it into
place. Latching is indicated by an audible snap.
Содержание SS 4320
Страница 31: ...78 8122 3169 0 F 31...