Hang remaining clusters next to the first
cluster in the same manner, connecting
with appropriate fasteners, then leveling.
3-85-105
Installation
6
Level the Cluster
With the first cluster hung in place,
level it with the gripper (either
adjusting the gripper placement
on the cable or the loop side).
Pull to raise
the cluster and
to increase the
loop size
Pull to
tighten loop
7
Hang Additional Clusters
For more information, please visit 3-form.com or call 800.726.0126
June 2020 | VeLO | ReV 009 © 2020 3form, Inc. All rights reserved.
Velo Ceiling Tiles
tm
Solution Document
9