Installation
Required Tools
1
Arrange Seeyond Tiles
Arrange the Seeyond Tiles in order. Tiles are arranged with columns designated by letters and rows designated by numbers.
Start with A1 which will be the first tile (first row, first column). There will be a front set of tiles designated by "F" and a back
set of tiles designated by "B" (e.g. A1-F, A1-B).
Drill
Hammer Drill Bit
for 3/16
"
Fastener
(for Concrete Floor)
11/64
"
Drill Bit
(for Wood Floor)
For more information, please visit 3-form.com or call 800.726.0126
April 2018 | MAN-rTG-200-48 | rEV 002 © 2018 3form, inc. All rights reserved.
4