3D Systems, Inc.
12
Required Equipment
•
SLA part post-processing equipment and supplies . Refer to the section,
“Support equipment which includes, but is not
limited to” on page 13
.
•
Safety equipment . Refer to the section,
“Recommended safety equipment and supplies” on page 13
.
•
One or more Windows 7-equipped workstations . At least one system must be available at installation time to load this
computer with 3D Systems’ 3DManage software . Ask your 3D Systems representative about loading this software in
advance of your installation appointment .
Optional Equipment
•
Uninterruptible Power Supply (UPS) and any miscellaneous cables or cords - minimum rating of 5kVA for the ProX 800 .
•
Functioning network connection for a computer to the SLA system . If no network is available, ensure a computer is in
close proximity to the SLA system during your installation appointment .
53.9in
1370mm
21.9in
556mm
6in
152mm
22.5in
572mm
6.6in
168mm
5.5in
140mm
2.3in
57mm
A
DETAIL A
Third Party Supplies and Equipment
Third party supplies and equipment are purchased from parties other than 3D Systems . These components are recommended
or required for full post-processing capability . These items should be found and delivered prior to the installation of your ProX
800 . Your 3D Systems representative can offer guidance regarding optimal placement and location of this equipment .
For a partial list of providers for this equipment, refer to
“Appendix C: Third Party Supplies and Equipment” on page 18
.
These supplies, accessories, and equipment provide SLA system owners with complete part-building, processing, and finishing
capability .
Forklift lift points - ProX 800 Printer
TRANSPORTING THE ProX 800
When the 3D Systems Field Engineer arrives, and the crate is opened, use a forklift to lift the system . Refer to the following
diagram illustrating the forklift points .
Minimum length of forks is 6 ft (1 .8 m)
Recommended length is 6 .5 ft (2 m)
Fork Guides