background image

3D Systems, Inc.

12

Required Equipment

• 

SLA part post-processing equipment and supplies . Refer to the section, 

“Support equipment which includes, but is not 

limited to” on page 13

 .

• 

Safety equipment . Refer to the section, 

“Recommended safety equipment and supplies” on page 13

 .

• 

One or more Windows 7-equipped workstations . At least one system must be available at installation time to load this 

computer with 3D Systems’ 3DManage software . Ask your 3D Systems representative about loading this software in 

advance of your installation appointment .

Optional Equipment

• 

Uninterruptible Power Supply (UPS) and any miscellaneous cables or cords - minimum rating of 5kVA for the ProX 800 .

• 

Functioning network connection for a computer to the SLA system . If no network is available, ensure a computer is in 

close proximity to the SLA system during your installation appointment .

53.9in

1370mm

 

21.9in

556mm

6in

152mm

22.5in

572mm

6.6in

168mm

5.5in

140mm

2.3in

57mm

 

 

 

 

 

 

A

 

 

 

 

DETAIL A

Third Party Supplies and Equipment

Third party supplies and equipment are purchased from parties other than 3D Systems . These components are recommended 

or required for full post-processing capability . These items should be found and delivered prior to the installation of your ProX 

800 . Your 3D Systems representative can offer guidance regarding optimal placement and location of this equipment .
For a partial list of providers for this equipment, refer to 

“Appendix C: Third Party Supplies and Equipment” on page 18

 .

These supplies, accessories, and equipment provide SLA system owners with complete part-building, processing, and finishing 

capability .

Forklift lift points - ProX 800 Printer

TRANSPORTING THE ProX 800 

When the 3D Systems Field Engineer arrives, and the crate is opened, use a forklift to lift the system . Refer to the following 

diagram illustrating the forklift points .

Minimum length of forks is 6 ft (1 .8 m) 

Recommended length is 6 .5 ft (2 m)

Fork Guides

Содержание ProX 800

Страница 1: ...ProX 800 3D Production Printer Facility Guide Original Instructions...

Страница 2: ...ce and Location Selection 8 ProCure Floor Surface Requirements 8 ProCure Electrical Requirements 8 ProCure Ventilation Ductwork 8 SYSTEM DELIVERY 10 Preparation for Receiving 10 Shipment Arrival 10 In...

Страница 3: ...posal and Safety 17 Job Submission 17 APPENDIX C THIRD PARTY SUPPLIES AND EQUIPMENT 18 Part Washing Systems 18 Uninterruptible Power Supply 18 Hand Held UV Guns 18 Model Finishing Tools and Supplies 1...

Страница 4: ...efficient stereolithography SLA system that produces high fidelity parts from a broad range of plastics and composites The ProX 800 uses an SLA platform that expands the overall utilization of SLA par...

Страница 5: ...ad Cart ProCure 750 UV Curing Chamber The ProCure 750 UV Chamber is an optional accessory which provides essential final part curing to create a fully solidified part with stable mechanical properties...

Страница 6: ...Your site layout will vary NOTE Due to laser safety requirements the system should be located where access to the room can be avoided during service calls Optimal Site Layout FLOOR AREA SURFACE Floors...

Страница 7: ...ty Wall 600 mm 24 in ProX 800 system space requirements top view ProX 800 system space requirements front view MDM ProX 800 Printer P r i n t C h a m b e r D o o r Left Side Window Right Side Window M...

Страница 8: ...UPS with power conditioning For specific information on a suitable UPS contact a UPS manufacturer and provide the voltage rating current draw and desired backup time The manufacturer can recommend an...

Страница 9: ...N cm2 135 psi ProX 800 System External Enclosure 110 N cm2 160 psi MDM 324 N cm2 470 psi Exact total lled weight depends on material 3 8 cm 1 5 in 12 7 mm 0 5 in 10 cm 4 in MDM 1302 mm 51 in 1102 mm 4...

Страница 10: ...n lamps and high intensity incandescent lamps are not suitable and UV intensive lighting or ultraviolet exposure through windows should be avoided UV filters are available for windows and exposed fluo...

Страница 11: ...side if required or appropriate The left side of the unit has a built in exhaust fan and includes an 8 diameter duct connector If the curing chamber duct is joined to a duct that has positive pressure...

Страница 12: ...UV Chamber Dimensions 148 cm 58 3 in 148 cm 58 3 in 143 cm 56 3 in 58 cm 23 in 208 cm 82 in 109 cm 43 in 120 cm 47 3 in 264 cm 104 in Vent Fitting 20 3 cm 8 in ProCure UV Chamber Top View 178 cm 71 in...

Страница 13: ...ehouse until the 3D Systems representative is scheduled to install the systems If you do not have an adequate forklift on site contact the shipping company in advance of the shipment to discuss whethe...

Страница 14: ...stem Components continued from pg 10 Inspect Exterior of Printer Visually inspect the exterior of the printer for any damage incurred during shipping Notify 3D Systems Service immediately if anything...

Страница 15: ...9in 1370mm 21 9in 556mm 6in 152mm 22 5in 572mm 6 6in 168mm 5 5in 140mm 2 3in 57mm A DETAIL A Third Party Supplies and Equipment Third party supplies and equipment are purchased from parties other tha...

Страница 16: ...n area with down draft table for sanding Any desired post processing equipment to sand join grind polish paint or plate SLA parts Compressed air connection with pressure controller and fast closing co...

Страница 17: ...a forklift and a trained forklift driver available during installation Make sure that the forklift is rated to a weight capacity that is equal to or greater than the crated weight of the SLA system R...

Страница 18: ...ther regulatory agencies Follow applicable disposal guidelines Contact a local waste management company for recommendations on disposal requirements that affect your facility Do not leave uncured or l...

Страница 19: ...level for the SLA material 20 50 Refer to the section Humidity on page 5 Is adequate electrical power available to the site Are there at least two 220 V circuits two outlets each with its own circuit...

Страница 20: ...ed and locked during installation Is there a network connection Optional Is there a telephone line Optional MOVING EQUIPMENT AND SITE ACCESSIBILITY Is adequate space available for the equipment and su...

Страница 21: ...RAMCO products MK36CSSX TPM TPM Wash Unit MK36CSSX WRU Water Rinse Unit SA WRU Water Recycling Unit Uninterruptible Power Supply American Power Conversion or Toshiba 5kVA Hand Held UV Guns DDU Enterp...

Страница 22: ...Japan K K 4 6 8 Tsurumaki Setagaya ku Tokyo 154 0016 JAPAN General Inquiries 81 3 5451 1690 Material Orders 81 3 5451 1690 Customer Support 81 3 5451 1690 E mail japaninfo 3dsystems com U K 3D Systems...

Страница 23: ...3D Systems Inc 333 Three D Systems Circle Rock Hill SC 29730 www 3dsystems com 2016 3D Systems Inc All rights reserved p n 286511 00 Rev D...

Отзывы: