Create Permanent Virtual Channel (PVC)
171
Command Result
Example
Enter:
3 4 1 1 2 p2p 0 0 0 5.1.2 1 55 1 5.1.4 0 60
The following message is displayed:
A new PVC was created with call number: 11
Port Static Connection Parameters
Table 23 shows the port static connection parameter
s
that must be
entered at the prompt.
System action taken:
A full PVC with the required parameters is created.
System message display:
A new PVC was created with call number:
<n>
Table 23
Full PVC Call Parameters
Name
Description
Call Type
Whether the call defined is point-to-point (P2P) or
point-to-multipoint (P2M)
No default
Cell Loss level
Threshold for cell based discard
Priority
Whether the call cells are transferred through the
CoreBuilder
®
9000 ATM Enterprise Switch to the high
priority queue or low priority queue
Default: Low priority
First CLP
The setting of the cell loss priority at the input port
First Port number
The input port slot.group.port
First VPI
The input port VPI value for the call
First VCI
The input port VCI value for the call
Second Port number
The output port slot.group.port
Second CLP
The setting of the cell loss priority at the output port
Second VPI
The output port VPI value for the call
Second VCI
The output port VCI value for the call
Содержание CoreBuilder 9000
Страница 18: ......
Страница 36: ...36 CHAPTER 1 OVERVIEW...
Страница 44: ......
Страница 152: ...152 CHAPTER 6 MANAGING NETWORK INTERFACES...
Страница 224: ...224 CHAPTER 8 VIEWING STATISTICS...
Страница 306: ......
Страница 320: ...320 CHAPTER 10 ATM NETWORK BASICS...
Страница 332: ...332 CHAPTER 11 NETWORK INTERFACE MANAGEMENT...
Страница 348: ...348 CHAPTER 12 E IISP PROTOCOL...
Страница 374: ...374 CHAPTER 14 ATM SWITCHING...
Страница 410: ...410 CHAPTER 16 TRAFFIC MANAGEMENT...
Страница 426: ......
Страница 450: ...450 APPENDIX D TECHNICAL SUPPORT...
Страница 454: ...454 GLOSSARY...