3-14
I
NSTALLING
THE
M
ODULE
Installing the
Module
You do not need to power off the CoreBuilder 5000 Integrated System
Hub to install
or
remove
media modules. You can insert the module
while the hub is operating (this is called a hot swap).
To install a media module:
1
Properly ground yourself prior to handling the media module.
For example, attach a static wrist guard to yourself or touch a
grounded static mat prior to handling them media module.
2
Configure the media module as follows:
■
To install the media module in a managed hub (DMM Version 2.0 or
later), go to step 3 to complete the installation. To configure the
appropriate settings, go to Chapter 4,
■
To insert the media module in an unmanaged hub, configure the
DIP switch settings on the module to the desired settings (refer to
earlier in this chapter) and go to step 4.
3
Determine if the hub has enough power for the new module by
entering the SHOW POWER BUDGET command. Refer to Appendix A,
Specifications, for detailed information on the power for each watt
type.
Refer to the
Distributed Management Module Commands Guide
for
information on the SHOW POWER BUDGET command.
4
Locate an open slot in the hub. To expose a slot for the module,
remove the blank panel on the hub.