![3Com 7750 Series Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/3com/7750-series/7750-series_installation-manual_441218043.webp)
Post-installation Checklist
43
Follow the parameters defined in Table 42 for binding cables with ties.
Post-installation
Checklist
After you install your switch, use the checklist in Table 43 to verify that your switch
operates correctly.
WARNING:
Confirm that you have turned off the power before checking your
installation. Improper connections can injure people or damage components of
the switch.
Table 42
Cable Binding Parameters
Cable Bundle Diameter
Space Between Bundles
10 mm (0.5in)
80-150 mm (3.5 – 6 in)
10-30 mm (.5 – 1.2 in)
150-200 mm (6 – 8 in)
30 mm (1.2 in)
200-300 mm (8 – 12 in)
Table 43
Installation Checklist
Item
Normal
Abnormal (Remarks)
Antistatic wrist strap
Console cable
Ground wire
Power cord
Fabric
I/O module
Fan frame
Содержание 7750 Series
Страница 6: ......
Страница 44: ...44 CHAPTER 2 INSTALLING THE SWITCH 7750 ...
Страница 74: ...74 APPENDIX B OBTAINING SUPPORT FOR YOUR SWITCH ...