
32
C
HAPTER
2: I
NSTALLATION
Figure 5 shows an example of a PathBuilder S310 with all of the associated cabling
connected.
Figure 5
PathBuilder S310 Full System Configuration
Site Requirements
The operating site for the PathBuilder S330/S310 must meet the following
requirements:
n
Be within the maximum distances to the port and trunk connections, as well as
the NMS terminal
n
Have interconnect cabling and wiring ready and labeled
n
Have a dedicated source of switched and fused AC power or a primary DC
source.
n
Be within the operating environment for the PathBuilder S330/S310, as
specified under “Specifications” in Chapter 1.
n
Provide clearance for making all connections and performing maintenance.
Slot 7
Slot 8
Slot 9
T1-DSX/E1
T1-DSX/E1
V.35/
RS-449/
RS-530/
X.21
Video/Audio
Codec
RS-366
PBX
PBX
LAN
NMS Console
RS-232
Router
T1/E1
10BASE-T
V.35/
RS-449/
RS-530/
X.21
Содержание 3C63311 - SuperStack II PathBuilder S310 Bridge/router
Страница 86: ...74 CHAPTER 3 GETTING STARTED ...
Страница 176: ...164 CHAPTER 4 CONFIGURING PATHBUILDER S330 S310 MODULES PORTS AND APPLICATIONS ...
Страница 260: ...248 INDEX ...