
Installing the NBX System Hardware
99
Upgrading NCP Flash ....
Number of attempts to upgrade the flash = 1
NCP Flash Upgrade Complete
To turn on power to the NBX system and optional NBX chassis, follow
these steps:
1
Attach a power cord to the unit. For a a V5000 or a chassis, attaching the
power cord applies power to the unit. For a V3000 Analog, V3000 BRI,
V3001 Analog, or V3001 BRI, you must also press the power button on
the back of the unit to the ON position. For a V3001R, the power buttons
on the two power supplies are located on the front of the unit, behind
the face panel. Be sure to turn on both power supplies. The V3001R can
operate with only one power supply but both are required to provide
power redundancy.
2
Allow approximately 3 minutes for the system to complete the boot
process.
If you are using the Console port to monitor the boot sequence, the last
status message in the boot process reports
System Ready
.
3
Examine the status lights (LEDs) on the front panel to ensure that the
system is running properly. For status light descriptions, see:
■
V3001 Analog —
Figure 1
on
page 22
.
■
V3001 BRI —
Figure 2
on
page 25
.
■
V3001R —
Figure 3
on
page 27
■
V3000 Analog —
Figure 4
on
page 30
■
V3000 BRI —
Figure 5
on
page 32
■
V5000 —
Figure 6
on
page 34
You are now ready to establish network/LAN Connectivity. See
“Configuring NBX System Networking”
next.
Содержание 3C10122 - NBX Business Telephone
Страница 20: ...20 ABOUT THIS GUIDE...
Страница 80: ...80 CHAPTER 1 INTRODUCTION...
Страница 120: ...120 CHAPTER 2 INSTALLING SYSTEM HARDWARE COMPONENTS...
Страница 142: ...142 CHAPTER 4 ANALOG LINES...
Страница 162: ...162 CHAPTER 8 T1 DIGITAL LINE CARD...
Страница 192: ...192 CHAPTER 10 CONFIGURING IP TELEPHONY...
Страница 198: ...198 CHAPTER 11 TROUBLESHOOTING...
Страница 224: ...224 APPENDIX A SPECIFICATIONS...
Страница 230: ...230 APPENDIX B CIRCUIT PROVISIONING...
Страница 240: ...240 APPENDIX D OBTAINING SUPPORT FOR YOUR 3COM PRODUCTS...