360 Yield 360 Y-DROP ROGATOR Скачать руководство пользователя страница 3

INSTRUCTIONS 360 Y-DROP

ROGATOR

360YIELDCENTER.COM

3

ESTABLISH 

DROP LOCATIONS 

 

Figures 1 and 2

 

Step 1

   Locate the center of the machine and 

identify the location of all the drops. On 
the sprayer boom, mark where each riser 
mount will be located. This will ensure 
that the extension tubes will not interfere 
with the riser mounts.

 

Figure 3

 

Step 2

   For the primary boom; starting at the 

wing fold pivot pin, measure out and 
make marks at 61", 131", 190", 256"  
and 310" (all measurements are ±5"). 
Repeat for the other primary boom.

 

I.

Figure 1  

Figure 2

Figure 3

310"

256"

190"

131"

61"

Содержание 360 Y-DROP ROGATOR

Страница 1: ...productregistration 360yieldcenter com to complete the product registration for your 360 Y DROP so we can better support our products from day one and ensure you have the latest upgrades warranty par...

Страница 2: ...ps of the guide and the pictures may not exactly reflect your model While these steps will help you install most of your 360 Y DROP system you may need to custom fit some components with your particul...

Страница 3: ...On the sprayer boom mark where each riser mount will be located This will ensure that the extension tubes will not interfere with the riser mounts Figure 3 Step 2 For the primary boom starting at the...

Страница 4: ...r 120 Use Bag AD Step 2 Install bracket assembly 2 and flange lock nut 3 Hardware Kit D Repeat Steps 1 and 2 for the other OEM mount bracket kit Step 3 Install extension tube 4 Step 4 Install boom bra...

Страница 5: ...ction boom Step 4 Install adapter plate 5 and 3 8 flange nuts 6 Step 5 Install extension tube 7 onto bracket assembly 2 Figure 7 Step 6 Install boom bracket 1 onto extension tube 2 Bag BB Step 7 Insta...

Страница 6: ...order to span the full length of the center section 360 Y DROP boom you will need to cut and drill one of the 5 boom sections to 1 Mount this 1 section between two full 5 boom sections Drill a 7 16 t...

Страница 7: ...depend on your row spacing Figure 15 Step 2 Install riser tube assembly 1 into the breakaway assembly one piece 2 Step 3 Install pin 3 Repeat Steps 2 and 3 for the remaining riser tube assemblies NOT...

Страница 8: ...ock nut Repeat for the remaining riser mounts Hardware Kit C Figure 17 Figure 17 may show more or fewer riser mounts than your installation The alignment and quantity of the riser mounts will depend o...

Страница 9: ...S Figure 19 Step 1 Install shield 1 onto riser tube 2 Figure 20 Step 2 Install base unit 1 onto riser tube 2 Figure 21 Step 3 Assemble drag hoses 1 to 360 Y DROP base and secure with hose clamps 2 Fig...

Страница 10: ...ill or impact driver for Steps 5 and 6 Step 5 Install two screws 1 Step 6 Install two screws 2 Step 7 Install rubber washer 3 into the Y Figure 24 Step 8 Install riser hose assembly 1 into the Y Figur...

Отзывы: