INSTRUCTIONS 

360 Y-DROP

JOHN DEERE 4720

2

 INTRODUCTION

  

   Before beginning, it’s important to know where each mounting bracket fits relative 

to the row spacing involved. The 360 Y-DROP unit should be precisely centered 
on the machine, as this is critical to the assembly of the system to the sprayer and 
for mounting the system to your sprayer boom. There are, however, many boom 
variations among all sprayer models. Your sprayer may not be identical to the model 
in the following steps of the guide, and the pictures may not exactly reflect your 
model. While these steps will help you install most of your 360 Y-DROP system,  
you may need to custom-fit some components with your particular boom.

  RECOMMENDED TOOLS

  

  Ratchet wrench with 1/2” and 9/16” deep well sockets 

  

  3/8” 12-point socket

  

  1/2” and 9/16” combination wrenches 

  TORQUE VALUES

  

  Refer to these torque values when tightening all fasteners

  

  
    

    5/16" stainless

U-bolt

15 ft/lbs

  5/16" stainless 

Set screw

15 ft/lbs

  3/8" carbon

U-bolt

35 ft/lbs

  5/16" carbon 

U-bolt

30 ft/lbs

  5/16" carbon 

Stop bolt

30 ft/lbs

 QUESTIONS

  

  Call our Product Support team at 888-512-4890

Содержание 360 Y-DROP JOHN DEERE 4720

Страница 1: ...visit productregistration 360yieldcenter com to complete the product registration for your 360 Y DROP so we can better support our products from day one and ensure you have the latest upgrades warranty parts and technical support Thank you 360YIELDCENTER COM V1 01 25 2017 ...

Страница 2: ...the model in the following steps of the guide and the pictures may not exactly reflect your model While these steps will help you install most of your 360 Y DROP system you may need to custom fit some components with your particular boom RECOMMENDED TOOLS Ratchet wrench with 1 2 and 9 16 deep well sockets 3 8 12 point socket 1 2 and 9 16 combination wrenches TORQUE VALUES Refer to these torque val...

Страница 3: ...iser mount will be located This will ensure that the extension tubes will not interfere with the riser mounts Figure 3 Step 2 Starting at the wing fold pivot pin on the primary boom measure and mark points at 32 86 156 213 and 277 all measurements are 5 Repeat for the other primary boom I Figure 1 Figure 2 Figure 3 32 86 156 213 277 The second mounting location requires special instructions See pg...

Страница 4: ... assemblies 1 Figure 5 Step 2 Install two 4 spacer plates 1 From Center Section Kit Step 3 Install 5 16 x 2 bolts 2 with flat washers on the top and bottom and the Nylock nut Hardware Kit B from Center Section Kit Repeat Steps 1 3 for all wet boom support assemblies INSTRUCTIONS 360 Y DROP JOHN DEERE 4720 II Figure 4 Figure 5 360YIELDCENTER COM 1 2 1 4 ...

Страница 5: ...mbly 4 and nuts onto the rear OEM boom Bag EE Step 3 Install extension tube 5 into bracket assemblies 2 and 4 Step 4 Install 360 Y DROP boom bracket 6 onto extension tube 5 Bag BB Step 5 Install set screw 7 Hardware Kit A within Bag BB Figure 7 Step 6 Install set screws 8 P N 207042 Hardware Kit D within OEM Boom Bracket Kit Step 7 Install stop bolt assemblies 9 at the front and rear of the extens...

Страница 6: ...ithin Bag BB Figure 9 Step 5 Install set screw and jam nut 6 onto the OEM boom bracket P N 207042 Hardware Kit D within OEM Boom Bracket Kit Step6 Install stop bolt assemblies 7 at the front and rear of the extension tube Hardware Kit B within Bag BB Step 7 With the U bolt pointing to the rear in stall the yoke mount 8 and flange nuts to upper boom section Step 8 With the square U bolt threads poi...

Страница 7: ...1 Step 4 Install 360 Y DROP boom bracket 2 on extension tube 1 Bag BB Step 5 Install stop bolt assemblies 3 Hardware Kit B within Bag BB Step 6 Install set screws 4 on bracket assemblies Hardware Kit D within the Center Section Kit Figure 12 Step 7 Install set screw 1 on Y DROP boom bracket Hardware Kit D within the Center Section Kit Repeat steps 1 7 for the remainder of the center section square...

Страница 8: ... In order to span the full length of the center section 360 Y DROP boom you will need to cut and drill one of the 5 boom sections to 1 Mount this 1 section between two full 5 boom sections Drill a 7 16 through hole centered 2 from the outside edge Figures 15 and 16 Step 5 Install square U bolt 1 the 5 16 extra thick washers and the 5 16 nuts over the 360 Y DROP boom 2 Hardware Kit A Step 6 Install...

Страница 9: ... will depend on your row spacing Figure 19 Step 2 Install riser tube assembly 1 into the breakaway assembly one piece 2 Step 3 Install pin 3 Repeat Steps 2 and 3 for the remaining riser tube assemblies NOTE Included in most sprayer mount packages are standard riser mounts to be used when primary booms are folded and in transport mode These standard riser mounts should be mounted in locations that ...

Страница 10: ...d Nylock nut Repeat for the remaining riser mounts Hardware Kit C Figure 21 Figure 21 may show more or fewer riser mounts than your installation The alignment and quantity of the riser mounts will depend on your row spacing Figure 22 Step 2 Install riser tube assembly 1 into the riser mount 2 Step 3 Install pin 3 Repeat Steps 2 and 3 for the remaining riser tube assemblies VI Figure 20 Figure 21 F...

Страница 11: ... HOSES Figure 23 Step 1 Install shield 1 onto riser tube 2 Figure 24 Step 2 Install base unit 1 onto riser tube 2 Figure 25 Step 3 Assemble drag hoses 1 to 360 Y DROP base and secure with hose clamps 2 Figure 26 Step 4 Note the orientation of the drag hose clamps The tails should point inward VII Figure 26 2 2 1 1 2 1 ...

Страница 12: ...iver for Steps 5 and 6 Step 5 Install two screws 1 Step 6 Install two screws 2 Step 7 Install rubber washer 3 into the Y Figure 28 Step 8 Install riser hose assembly 1 into the Y Figure 29 Step 9 Route riser hose assembly 1 as shown in Figure 26 Step 10 Install the riser hose assembly to the OEM nozzle body Step 11 Use 3 equally spaced plastic ties to secure the riser hose assembly Repeat Steps 1 ...

Отзывы: