| Vertical Blinds
5
• Using the draw cord, draw the carrier clips across the
headrail. (see “Vertical Blind Operation”)
• Place one vane into the last carrier clip at each end of the
headrail. (see “Vertical Vane Installation”)
• Hold the vertical headrail
above the window opening
so the attached vanes are
positioned at the desired
length. (Floor length blinds
should clear the floor by
approximately
1
/
2
" -
3
/
4
").
• Once the blind is level,
mark the wall above and
to the side of each bracket
using a pencil.
• Remove the brackets from
the headrail by pushing up
on the tail of each mounting
clip. Set the headrail aside.
• Facing the window, position
one bracket slightly under
the left set of pencil marks.
• Mark the screw holes on the
mounting surface through
the back of the bracket using
a pencil.
• Using a drill with a
1
/
16
" drill
bit or an awl, make a small
pilot hole at each pencil
mark.
• Mount the bracket using two
of the screws provided and
repeat this procedure for any
remaining brackets making
sure all brackets are installed
level and in line.
• Go to “Outside Mount
Valance Installation”.
OUTSIDE MOUNT MOUNTING CLIP /
BRACKET INSTALLATION
OUTSIDE MOUNT
• Snap brackets on to the
headrail as stated in the
"Mounting Clip/Bracket
Placement" section.
NOTE: Brackets require a flat vertical mounting surface of
1
7
/
8
" to install.
To Install the Valance:
• Attaching Valance Clips to
Head Rail
• Place front of clip as shown
on the front lip of the head
rail
• Push down on the back of
the clip until the clip snaps
onto head rail
• Slide the valance into the
valance clips as shown
OUTSIDE MOUNT
VALANCE INSTALLATION
NOTE: Standard vertical valance, Curved Valance, Coronado
Valance and the Montreal Valance are attached to the
headrail in the same manner.
BEFORE YOU START: The headrail and vanes must be
installed, see “Headrail Installation” and “Vane Installation”.