background image

6

2VV.

 Creating innovative solutions for you and your business since 1995.

ver.2 15-01-20

3. COMMISSIONING

   

PLEASE NOTE

Before starting up the unit, check the following:

• 

Did you leave inside tools or objects that could damage the unit?

• 

Is the supply of energy and heating water (if applicable) adequate?

• 

Is the unit well closed?

• 

Is the control module properly connected?

• 

Does the unit have adequate protection according to the applicable standards?

Curtain off

First fan speed

Second fan speed

Third fan speed

          READ CAREFULLY!
Before the initial commissioning, check:

• 

that the device is well fastened to the support structure,

• 

that the device is properly closed

• 

that the power supply is properly connected, including the earthing and the external trigger protection,

• 

that all the electrical components are securely connected,

• 

that the installation complies with all the instructions herein,

• 

that no tool or any other object that may damage the unit remains within.

 ATTENTION!

• 

Interventions or changes to the internal connections are forbidden and shall result in the loss of warranty.

• 

We recommend the use of accessories supplied by our company. Contact your supplier in case of doubts regarding the 

use of non-original accessories.

START-UP

After switching on the main power supply, activate the unit turning the switch to one of the three fan speeds.

4. CONTROL

First heating level

Second heating level

(only for electric heating)

Heating off

Содержание FINESSE

Страница 1: ...ver 2 15 01 20 FINESSE STANDESSE BASIC control Installation and operation instructions EN...

Страница 2: ...2 2VV Creating innovative solutions for you and your business since 1995 ver 2 15 01 20...

Страница 3: ...t orde red In case of discrepancy do not unpack the product and contact the vendor After unpacking check that the product and all the other components are in good order In case of doubt contact the ve...

Страница 4: ...3 DK2 DK1 1 0 1 2 3 b a 6 X f 6 X 3 0 2 1 X X b 2 a 1 e 5 x x X X X X N L L open M ZV 3 Pokojov termostat TER P CP M VCS R2 BA S 5x1 0 mm 2 4 5 1 2 3 DK2 DK1 DOOR CONTACT 1 2 3 4 5 6 f e d c b a X f...

Страница 5: ...to the electrical board with adequate force and always perpendicular to the base 2 1 1 DS door contact TECHNICAL INFORMATION suitable for all BASIC regulation Isolated break contact with maximum volta...

Страница 6: ...re that the device is properly closed that the power supply is properly connected including the earthing and the external trigger protection that all the electrical components are securely connected t...

Страница 7: ...cleaner to clean the suction cover and the inside of the unit See the installation manual of the ESSENSSE NEO curtain 7 SERVICE 7 1 IF YOU ARE UNABLE TO REPAIR THE UNIT If you were unable to solve a...

Страница 8: ...AM VCS R2 BA E AC FUSE PE N N PE L2 L1 L2 L1 L3 L3 CYKY 5Cx 400V 50Hz 6 2 8x1 0mm 7 DOOR CONTACT 4 5 3 2 1 DK1 DK2 1 1 8 8 4 5 4 5 7 7 6 6 2 3 2 3 2 1 3 2 1 3 7 8 6 5 7 8 6 5 2 2 3 4 3 4 1 1 1 1 6 7 8...

Страница 9: ...IAGRAM VCS R2 BA V AC CYKY 3Cx1 5 230V 50Hz N N FUSE L L 5 4 2 1 3 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 PE PE DOOR CONTACT 1 2 3 4 5 6 7 8 1 4 3 2 8 7 6 5 4 5 1 2 3 DK2 DK1 1 0 1 2 3 4 5 6 f e d c b a 6 X...

Страница 10: ...nce 1995 ver 2 15 01 20 8 WIRING DIAGRAM VCS R2 BA S AC N PE L 5x1 0 mm 2 CYKY 3Cx1 5 230V 50Hz N PE L FUSE 1 7 8 6 5 2 3 4 4 5 1 2 3 DK2 DK1 8 7 6 5 4 3 2 1 DOOR CONTACT 2 1 3 2 1 3 1 2 3 4 5 6 f e d...

Страница 11: ...usiness since 1995 ver 2 15 01 20 9 CONCLUSION 9 CONCLUSION In case of any doubt or query do not hesitate to contact our sales or technical support departments CONTACT Address 2VV s r o F blovka 568 5...

Отзывы: