background image

Pag

ina

 4 ǀ 8 

InstAnl.V08-2014-0 

3.4.  Water connection and safety group 

Perform all connecting and installing work according to the valid rules and regulations. Take 
assembling hints of the safety group into account.  

Flush all pipes connected to the storage tank. 

Assemble the hot water pipe and the cold water pipe as well as the safety group  to the cold 
water  supply  line.  Thereby  pay  attention  to  the  resting  pressure  of  the  chilled  water 
distribution net and use a pressure reducing valve if necessary.  

3.5.  Temperature sensor 

Position the sensor at the height of the terminal strip, at which the temperature for the control 
function should be recorded.  

4. Start-up

Before start-up the system has  to be tested for leaks, the right hydraulic connection as  well 
as  correct  electrical  connections.  Furthermore  an  attentive,  respectively  an  appropriate 
rinsing of the system in accordance with DIN 4753 has to be carried out.  

Open a followed tapping point until the device is filled and the pipeline system is free from air. 

Fill and air the heating system as well as the heat exchanger. 

Control  the  function  of  the  safety  valve  as  well  as  further  security-related 
supplies.  

Control the accessories. 

Содержание 2P 400l

Страница 1: ...tructions This installation construction contains important advice for handling installing and starting up a 2Power solar plant Read these advice carefully before mounting The mounting and the start up have to be conducted by a permitted specialized company With an improper installation the guaranty expires ...

Страница 2: ...sense the temperature The associated thermal insulation of the storage protects the tank against heat loss 1 2 Intended use The described 2Power storage tank is provided for the storing of heating water and the heating of the drinking water Any use which goes beyond these limits is not regarded as the intended use The intended use also includes the observance of this instruction as well as the ins...

Страница 3: ...ies must be checked for possible transport damage Neither the manufacturer nor the supplier is liable for shipping damages but the freight carrier After the acceptance of goods without objections transport damages can no longer be asserted 3 Installation The installation start up as well as maintenance and repair of the device may only be carried out by an expert technician A safety valve is neces...

Страница 4: ... necessary 3 5 Temperature sensor Position the sensor at the height of the terminal strip at which the temperature for the control function should be recorded 4 Start up Before start up the system has to be tested for leaks the right hydraulic connection as well as correct electrical connections Furthermore an attentive respectively an appropriate rinsing of the system in accordance with DIN 4753 ...

Страница 5: ...e 2 2Power return flow 3 Cold water supply line 4 Hot water outlet 5 Heat generator flow pipe 6 Heat generator return flow 7 Flow pipe heat generator 1 heating flow pipe 8 Return flow heat generator 2 heating return flow 9 Flow pipe heat generator 2 10 Return flow heat generator 2 11 Auxiliary electric heating 12 Vent 13 Drain ...

Страница 6: ...ons in mm A B C D E F G H I J 2P 400l 1 406 1 306 590 350 260 400 590 725 850 650 2P 600l 1 695 1 595 790 465 310 515 790 925 1 050 750 2P 850l 1 885 1 785 785 465 350 615 945 1 080 1 205 800 2P 1000l 1 885 1 785 785 465 350 615 945 1 080 1 205 850 ...

Страница 7: ... Diameter without insulation 650mm 750mm 800mm 850mm Empty weight 125kg 165kg 185kg 200kg Surface Solar heat exchanger Drinking water heat exchanger 2m 2 5m 2m 4m 3 1m 6m 3 1m 6m Continuous output Storage temperature 70 C approx 15kW 25kW 35kW 6 5l min 9 5l min 15l min 7 5l min 13l min 18l min 9l min 15l min 21l min 9l min 15l min 21l min Draw off rate limitation Storage temperature 70 C Storage t...

Страница 8: ...y and all responsibility for units damaged after having been operated together with 2Power modules supplied by Agiba Heating but failing to take heed of technical data sheets and the installation instructions Subject to technical modifications in the course of product advancement Mistakes and errors reserved Agiba Heating Frjentsjerterdyk 1 8855 XC Sexbierum www agibaheating nl Tel 31 0 72 7920174...

Отзывы: