
Installation Completion
Check the connection of all wires and in the board connector.
WARNING
• Make sure that all the terminals of the unused connectors are properly tightened to avoid
vibrations caused by sound.
• An incorrectly made installation may compromise the device waterproofness. Water infil-
tration may damage the electronic part.
• Make sure that all the holes are filled with some waterproof material – the top part, around
the cables and the screws.
• Use silicone or some other sealant to seal the box against an uneven wall. Thus, you
prevent water leakage and wall damping.
Most Frequent Installation Errors
Always mount the metal bolts and level the bases on an even surface
before
tightening the screws.
WARNING
Make sure that the bases are levelled properly to avoid water leakage and electronic
damage.
Installation
95
Содержание Access Unit QR
Страница 1: ...2N Access Unit QR User Manual...
Страница 34: ...1 Module Installation Installation 34...
Страница 35: ...Box Installation Installation 35...
Страница 36: ...CAUTION When the walling material has hardened break off the side stops Installation 36...
Страница 38: ...1 Module Installation into Box Installation 38...
Страница 39: ...Installation 39...
Страница 40: ...2 Module Installation Installation 40...
Страница 41: ...Box Installation Installation 41...
Страница 42: ...CAUTION When the walling material has hardened break off the side stops Installation 42...
Страница 44: ...2 Module Installation into Box Installation 44...
Страница 46: ...3 Module Installation Installation 46...
Страница 47: ...Box Installation Installation 47...
Страница 48: ...CAUTION When the walling material has hardened break off the side stops Installation 48...
Страница 50: ...Installation of Multiple 3 Module Boxes Next to Each Other Installation 50...
Страница 51: ...Installation 51...
Страница 52: ...Installation 52...
Страница 53: ...3 Module Installation into Box Installation 53...
Страница 56: ...1 Module Installation Installation 56...
Страница 57: ...Box Installation Installation 57...
Страница 59: ...1 Module Installation into Box Installation 59...
Страница 61: ...2 Module Installation Installation 61...
Страница 62: ...Box Installation Installation 62...
Страница 64: ...Installation of Multiple 2 Module Boxes Next to Each Other Installation 64...
Страница 65: ...Installation 65...
Страница 66: ...Installation 66...
Страница 67: ...2 Module Installation into Box Installation 67...
Страница 69: ...3 Module Installation Installation 69...
Страница 70: ...Box Installation Installation 70...
Страница 72: ...3 Module Installation into Box Installation 72...
Страница 76: ...1 Module Installation Installation 76...
Страница 77: ...Installation 77...
Страница 79: ...2 Module Installation Installation 79...
Страница 80: ...Installation 80...
Страница 82: ...Installation of Multiple 2 Modules Next to Each Other Installation 82...
Страница 83: ...Installation 83...
Страница 85: ...Installation 85...
Страница 86: ...Installation 86...
Страница 88: ...Installation of Multiple 3 Modules Next to Each Other Installation 88...
Страница 89: ...Installation 89...
Страница 90: ...Installation 90...
Страница 92: ...On uneven wall Installation 92...
Страница 93: ...On glass The backplate for uneven surfaces can also be used for installation on glass Installation 93...
Страница 94: ...Installation 94...
Страница 98: ...Device Connectors Figure 1 Main unit connector wiring Installation 98...
Страница 117: ...Troubleshooting Refer to faq 2n cz for the most frequently solved problems Troubleshooting 117...
Страница 128: ...2N Access Unit QR User Manual 2N Telekomunikace a s 2024 2N com...