background image

Installation Guide

Due to regular upgrades of systems and products, ZKTeco could not guarantee exact consistency between the 

actual product and the written information in this manual.

Full Height Turnstile Series

Applicable Models: FHT2300 Series, FHT2300D Series,
FHT2400 Series, FHT2400D Series

Doc Version: 1.1

Date: July 2022

English

Summary of Contents for FHT2300

Page 1: ...s ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual Full Height Turnstile Series Applicable Models FHT2300 Series FHT2300D Series FHT24...

Page 2: ...recommended that the device should not be used in the corrosive environment 2 Preparation To install the device you must have A Screwdriver To remove or install the screw on the device A Pencil To ma...

Page 3: ...2 3 Installation Place the frame to the installation site and mark the oor following the periphery of the legs 1...

Page 4: ...ere may be errors please refer to the actual product FHT2300 Series FHT2300D Series 92 00 142 00 92 00 146 00 70 00 182 00 274 64 410 29 575 00 596 44 1242 89 594 44 576 44 92 00 92 00 92 00 146 00 14...

Page 5: ...0 Series 8 00 47 63 682 39 146 00 164 00 146 00 682 39 8 02 47 63 91 65 142 00 91 65 66 07 565 07 1180 49 1206 07 FHT2400D Series 629 31 575 00 70 00 91 65 564 37 562 37 142 00 91 65 1179 10 146 00 47...

Page 6: ...ds to the mark on the device 4 User must pull the power cable and Ethernet from the machines and put them into the wire slot 25mm PVC pipe Tether Cable Power Cable Ethernet 5 The input voltage for thi...

Page 7: ...holes Then insert the bolts accordingly and x them with a wrench Finally insert the washer and nut tighten it with a wrench 6 Put the mainframe box on the frame after connect the power cable Ethernet...

Page 8: ...attention to the details in green circle both of them should be in vertical direction The rotor direction should be place like this Planview of rotor of three arm barrier 120 position and direction b...

Page 9: ...8 7 Put the whole rotating part in the middle of the frame and mainframe box and then x up with screws and connection block...

Page 10: ...9 Bottom Top Front...

Page 11: ...4 Wiring Diagram After xing the device open the mainframe box to connect power wire and reader Pull out the reader and power cord from both sides of the column and connect to the corresponding interfa...

Page 12: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2022 ZKTECO CO LTD All Rights Reserved...

Reviews: