Zeverlution      

S

Evershine  

TL Eversol TL

Power     

Management & EEG Setup  Guide

Summary of Contents for Zeverlution S

Page 1: ...Zeverlution S Evershine TL Eversol TL Power Management EEG Setup Guide...

Page 2: ...r Power Management EEG Setup Guide Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 22...

Page 3: ...3 IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING 3 1 4 When is Power Management EEG Required 4 1 4 1 Power Management 4 1 4 2 EEG 70 4 1 5 Hardware Requirements 5 1 6 Software Requirements 5...

Page 4: ...IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING The grid code power management and EEG settings should be checked during the commissioning of a PV plant It is essential to ensure that the corr...

Page 5: ...r of according to a defined characteristic curve which is a function of U Un Active Power Limitation The PV plant will limit the active power based on either the rated inverter AC output rated DC arra...

Page 6: ...activating Activating 1 7 1 Checking Firmware Version It is necessary to ensure that the inverter has the appropriate firmware version For older firmware versions it is not necessary to deactivate or...

Page 7: ...F is displayed To confirm the setting simply release the control button and wait until the Normal screen is displayed 4 To activate the Power Management press the control button until ActiPowFun ON is...

Page 8: ...ent_1_Phase_Inv_Rev1_20160426 7 1 8 Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 2...