Install-MONTE_BASE - SEP_2015.doc www.yunca.co.nz
Page 1 of 4
A division of Terry Young Ltd, New Zealand
INSTALLATION INSTRUCTIONS for
MONTE BASE
WOOD BURNER
• Clean Air Sub 1.0 • Clean Air WET Sub 1.0
• Clean Air Sub 0.7 • Non Clean Air (Rural).
SEPTEMBER 2015
TESTED in compliance with AS/NZS 2918: 2001
A
. Yunca recommends that competent trades persons carry out all installations (e.g.
NZHHA Registered Installer), to obtain maximum performance and safe, efficient heating.
B
. A permit is required and we suggest you check with local building inspectors as by-laws
do vary from area to area.
Also notify your Insurance Company that a solid fuel heater has been installed.
C
. Floor Protector
–
1. Must extend a minimum of 300mm in front of the fuel-loading or ash-removal opening.
2. Must extend at least 200mm from each side of the fuel-loading or ash-removal opening
unless it forms an abutment with a wall or heat shield at a lesser distance.
3.
Ash Floor Protector must be constructed of non-combustible materials.
D
. Seismic restraint
– Heater must be restrained from seismic movement as required by AS/NZS
2918:2001. 10mm diameter bolting holes in the rear corners allow restraint.
E.
Manufacturers recommended tested minimum clearances from combustible walls.
Tested to AS/NZS 2918 : 2001 by APPLIED RESEARCH SERVICES LTD
Clearance
Rear Clearance (with YUNCA STD FLUE GUARD fitted)
200mm
Side Clearance (with YUNCA STD FLUE GUARD fitted)
450mm
Corner Clearance (with YUNCA STD FLUE GUARD fitted)
280mm
F. YUNCA Flue Kit (Complies with AS/NZS 2918:2001 Appendix F): FIG A, B & E
1
. 4.2m x 150mm stainless steel flue.
4
. 1 x insulation boundary shield.
2
. 2.4m x 250mm galvanised liner.
5.
2 x spider brackets.
3.
1 x ceiling tile (430mm x 430mm).
6.
1 x weather cap & cowl.
Please Note:
All flue joints must be sealed with flue sealing compound. Use stainless
steel screws or rivets to join the flue pipe (three equally spaced places at each joint). The
first length of flue must be fixed to the flue spigot with at least one stainless steel screw
or rivet. The required minimum flue termination height is 4.6 m above the floor protector.
G. MONTE WOODBURNER Flue Mounted Shield (Flue Guard) Kit. Complies (with
heater) to AS/NZS 2918:2001): Refer FIG A
1 x 1200mm length lined back guard, plus an
optional
adjustable 900mm extension.
1 x 1200mm length perforated front guard.
1 x 1200mm length tertiary back guard with spacers.
1 x top front deflector shield (half round shaped, angled 30 degrees when installed).
Please Note: The minimum Flue Mounted Shield Height is 1200mm.