manualshive.com logo in svg
background image

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) 

Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01OVLPA1006DDFW-V1

10x6 Overlap apex shed with double doors, fixed windows, solid sheet floor and roof.

01OVLPA1006DDFW-V1-NW

10x6 Overlap apex shed with double doors, no windows, solid sheet floor and roof.

01OSBA1006DDFW-V1

10x6 Shiplap apex shed with double doors, fixed windows, solid sheet floor and roof.

01OSBA1006DDFW-V1-NW

10x6 Shiplap apex shed with double doors, no windows, solid sheet floor and roof.

01SHPA1006DDOW-V1

10x6 Shiplap apex shed with double doors, opening windows, T&G floor and roof.

01SHPA1006DDOW-V1-NW

10x6 Shiplap apex shed with double doors, no windows, T&G floor and roof.

Refer to the instructions pages for you specific product code

14/01/2014

Содержание 01OVLPA1006DDFW-V1

Страница 1: ...and in the case of childrens products independently tested to EN71 level we cannot accept responsibility for your safety whilst erecting or using this product Mercia Garden Products Limited Sutton On...

Страница 2: ...uss Frame 932mm Qty 2 Eaves Frame 1502mm Qty 4 Truss Block 140mm Qty 2 Door Block 140mm Qty 2 Fascia 1016mm Qty 4 Door Strip 1016mm Qty 1 Door Strip 530mm Qty 1 Cover Trim 1575mm Qty 6 Window Strip 54...

Страница 3: ...6x50mm Screws Pre drill hole 50mm screw Step 3 12x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 4 Use for no window buildings 3 Use for no window buildings 3 Pre drill hole 50m...

Страница 4: ...ith the angle pointing upwards into the building aligning the block centrally along the join between the side panels with one screw in each panel ii Fix the support bar to the block using 1 x 50mm scr...

Страница 5: ...sing 3x30mm screws for each sheet b b 40mm screw Pre drill hole 6 18 Step 10 Once the roof is fixed attatch the building to the floor with 70 mm screws 24 x 70mm Screws b b b b b b b b b b b b b 70mm...

Страница 6: ...ws 2x30mm Black Screws 17 30mm screw Pre drill hole a a b 30mm screw Step 13 16 16 16 16 16 16 Fit the cover trims to the building and secure in place with 40mm screws as shown Pre drill to avoid spli...

Страница 7: ...s to the left Fit the styrene sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strip...

Страница 8: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back P 15...

Отзывы: