background image

Please file in Service Binder

6196 911 - 01      07/2022

WAGO BAC

net

/IP 

WITH

 

MS/TP ROUTER GATEWAY

Installation and 

Service Instructions

for use by heating contractor

BMS communication with heating systems via BACnet

WAGO BACnet/IP with MS/TP router gateway

Product may not be exactly as shown

Read and save these instructions

for future reference.

IMPORTANT

Read and save these instructions

for future reference.

Product may not be exactly as shown

IMPORTANT

Summary of Contents for BACnet/IP

Page 1: ...ons for use by heating contractor BMS communication with heating systems via BACnet WAGO BACnet IP with MS TP router gateway Product may not be exactly as shown Read and save these instructions for fu...

Page 2: ...For a listing of applicable literature please see section entitled Important Regulatory and Safety Requirements Licensed professional heating contractor The installation adjustment service and mainte...

Page 3: ...ists 5 Mounting the Gateway 6 Preparing for Installation 7 Quick Start Guide WAGO BACnet IP with MS TP Router 8 Process Overview 12 Installing the Module 12 Connections and Operating Elements 13 Conne...

Page 4: ...ccidental activation of power during service work Please carefully read this manual prior to attempting installation Any warranty is null and void if these instructions are not followed For informatio...

Page 5: ...product documentation for the following purposes H To monitor systems H To operate systems H To optimize systems With regard to the communication interfaces ensure on site that the system requirements...

Page 6: ...on and Service Mounting the Gateway Installation 1 Loosen the retaining screws from the extension kit enclosure do not remove 2 Remove cover and set aside 3 Mount the extension module enclosure to the...

Page 7: ...tion Preparing for Installation Legend A Viessmann boiler B Building management system C Terminator 120 D Gateway E Power supply unit F Laptop with web browser and WAGO Web Visu G Module enclosure H B...

Page 8: ...ilers add points Note Commission your boiler s before configuring the automation gateway Open web browser to https 192 168 1 17 user user Project Settings Navigate to General Project Settings H Select...

Page 9: ...continued Installation Add Data points Navigate to Datapoints CAN Status Make sure you see all the heat generators you want to add to the system Select Show Datapoints and Confirm action to discover...

Page 10: ...the MS TP green section to accommodate the BMS network requirements WBM IP Address and UDP Port Optional Note It is recommended to not change the IP addresses for the Wago gateway and the MS TP router...

Page 11: ...net Configurator Set BACnet Device ID Optional Note download the tool from the link on the left 1 Scan the network for BACnet devices 2 Right click on the WAGO Gateway and select Add to Database 3 Swi...

Page 12: ...sunlight Operation by unauthorized persons may result in damage to the system Access to the gateway must only be possible for authorized specialists with a key or tool IMPORTANT IMPORTANT Step Respon...

Page 13: ...with terminator See page 14 G CAN low for looping through the CAN bus H CAN high for looping through the CAN bus K CAN bus shield L 24VDC supply voltage connection M Do not open N Operating mode switc...

Page 14: ...AN bus interface has the status Bus Off Short circuit or other serious fault H Check CAN bus connection Plug cable terminator H Check whether boiler is switched on H Check installation and connections...

Page 15: ...Gateway Power supply unit Example BACnet IP gateway 1 Insert a small flat head screwdriver into the opening directly above the wire 2 Tilt the handle of the screwdriver up 3 Pull the wire straight ou...

Page 16: ...ical properties of the cable Only use cable types listed in the following table Only use one cable type within a CAN bus Recommended cable type on site CAN bus cable In line with ISO 11898 2 twisted p...

Page 17: ...tion and Service Establishing the CAN Bus Connection continued Installation Legend A CAN bus shield B Cable for lA for controlling the boiler standard delivery of the gateway Installation and service...

Page 18: ...n attachment until the CAN bus cable has been connected If the gateway is at the beginning or end of the CAN bus Legend A Plug in attachment with terminator standard delivery If the gateway is not at...

Page 19: ...Gateway Installation and Service Establishing the Connection to the BACnet IP Gateway Installation The connection to the network must be established by the system integrator Legend A Connect BACnet IP...

Page 20: ...the Gateway to the Power Supply Unit Installation Connecting cores in the power supply unit Legend A Cable cores between gateway and power supply unit standard delivery The WAGO gateway is supplied in...

Page 21: ...and G are not interchanged IMPORTANT Electrical installations must comply with the latest edition of In the U S A the National Electrical Code NEC ANSI NFPA 70 and any other state local codes and or r...

Page 22: ...ge 8 LED indicators Status of the LED for standard mode SYS Green RUN Green I O Green MS OFF NS OFF U1 Green U2 U6 Off BT Green Note If the LED lights up red or yellow a BACnet specific error is prese...

Page 23: ...11 01 WAGO Gateway Installation and Service Connecting the Plug in Attachment Installation Dismounting the Gateway Dismounting the controller Connecting the Plug in Attachment Dismounting the Power Su...

Page 24: ...Gateway Specifications WAGO BACnet IP gateway Power supply 24VDC Power consumption Max 116 mA Nominal rating 2 8 W Permissible ambient temperature H Operation H Storage H Transport 32 to 104 F 0 to 4...

Page 25: ...Attachment Power Supply Power supply unit Rated voltage 100 to 240V Rated frequency 50 to 60 Hz Rated current 1 34A Output voltage 24VDC Permissible ambient temperature H Operation H Storage and trans...

Page 26: ...terminal block Jumper selectable bias and termination LED Indicators Green MS TP flash for activity Regulatory Compliance FCC Part 15 Class A UL 508 CSA C22 2 No 142 M1987 Industrial Control Equipment...

Page 27: ...a connection to the MS TP network To configure the router connect it to a computer with an Ethernet cable and use a standard web browser For initial configuration the PC chosen for the procedure shoul...

Page 28: ...ffect Advanced Status and Security screens used to access status and more configuration Device Parameters Device Name The BASrouter s Device Object Name can be configured in this field It is required...

Page 29: ...t Value 2001 This 16 bit decimal network number 1 65534 must be unique for all BACnet networks within the BACnet internetwork No other networks regardless of type can have the same network number Do n...

Page 30: ...d Disposal Additional Information Viessmann products can be recycled Components and substances from the system are not part of ordinary household waste For decommissioning the system isolate the syste...

Page 31: ...31 6196 911 01 WAGO Gateway Installation and Service...

Page 32: ...6196 911 01 Technical information subject to change without notice Printed on environmentally friendly recycled and recyclable paper WAGO gateway Installation and Service...

Reviews: