Quick Start Guide: Shadow Premier 2U Client Workstation 

This sheet covers the installation of the Valerus Premier Client Workstation 2U rack-mount form. This system 

should only be installed by a qualified technician using common hand tools and approved materials in 

accordance with the National Electrical Code ANSI/NFPA 70, state and local wiring codes.

Unpacking and Installation

Unpack the unit and place it in the mounting location. Hard drives are preinstalled from the factory. 

Keyboard and mouse are included with the unit. 

Connect monitor(s) using the DP or HDMI ports (refer to figures above). DP to HDMI adapters are included as 

needed.

Note

: If the system includes the Quad Monitor Support option, connect the monitors using the four mini-DP 

ports on the add-on card (see picture above). Do not connect monitors to the onboard video connectors.

Use the mini-DP to HDMI adapters provided in the box.

Connect unit to the network using the WAN (Internet) port. Refer to figure above. The port is setup to 

procure an IP address automatically using DHCP.

Attach the power cord and power the unit on. It is recommended to use an Uninterrupted Power Supply 

(UPS) to prevent data loss/corruption and/or drive failures due to sudden power loss. 

VICON INDUSTRIES INC.   TEL: 631-952-2288   FAX: 631-951-2288   TOLL FREE: 800-645-9116   

24-Hour Technical Support: 800-34-VICON (800-348-4266)   UK: +44 (0) 1489 566300   WEB: vicon-security.com

Vicon part number

8009-8325-35-01 

Product specifications subject to change without notice. Copyright ©2022. All rights reserved.

Vicon and its logo are registered trademarks and Valerus and its logo are trademarks of Vicon Industries Inc. 