background image

 

 

NM2-GXE-2230-xx-01 Install Guide 

33724 Rev. C 

           

https://www.transition.com

  

Page 

1

 of 

15

 

NM2

GXE

2230

xx

01

  

M.2

 

Gigabit

 

Ethernet

 

Fiber

  

Network

 

Interface

 

Card

 

Install

 

Guide

 

 

1

 

Gigabit

 

Ethernet

 

Fiber

 

NIC

  

 

Supports

 

PCI

 

Express

 

M.2

 

specification

 

 

Installs

 

in

 

Dell

 

OptiPlex

 

7040

 

and

 

7050

 

Micro

 

PCs

 

and

 

the

 

Wyse

 

7000

 

Series

 

thin

 

clients

 

Contents

 

Introduction

 

.....................................................................................................................................................................

 

1

 

Ordering

 

Information

 

.......................................................................................................................................................

 

2

 

Package

 

Contents

 

.............................................................................................................................................................

 

2

 

Specifications

 

...................................................................................................................................................................

 

3

 

System

 

Board

 

Layout........................................................................................................................................................

 

4

 

NIC

 

Hardware

 

Installation

 

Overview

 

................................................................................................................................

 

5

 

NIC

 

Hardware

 

Location

 

....................................................................................................................................................

 

5

 

Components

 

Overview

 

....................................................................................................................................................

 

6

 

Reference

 

Views

 

...............................................................................................................................................................

 

6

 

Pre

Installation

 

Checklist

 

.................................................................................................................................................

 

8

 

Hardware

 

Installation

 

Procedure

 

.....................................................................................................................................

 

9

 

PXE

 

Boot

 

Loader

 

from

 

Intel.com

 

....................................................................................................................................

 

11

 

Intel

 

i210

 

PROSet

 

Drivers

 

from

 

Intel.com

 

......................................................................................................................

 

11

 

For

 

More

 

Information

 

....................................................................................................................................................

 

12

 

Troubleshooting

 

.............................................................................................................................................................

 

12

 

Recording

 

Device

 

and

 

System

 

Information

 

....................................................................................................................

 

13

 

Contact

 

Us

 

......................................................................................................................................................................

 

13

 

Compliance

 

Information

 

................................................................................................................................................

 

13

 

Declaration

 

of

 

Conformity

 

.............................................................................................................................................

 

14

 

Record

 

of

 

Revisions

 

........................................................................................................................................................

 

14

 

 

Introduction 

The

 

Transition

 

Networks

 

NM2

GXE

2230

xx

01

 

and

 

01

D

 

are

 

1

 

Gigabit

 

Ethernet

 

Fiber

 

NICs

 

supporting

 

the

 

PCI

 

Express

 

M.2

 

specification.

 

They

 

are

 

designed

 

to

 

install

 

in

 

the

 

Dell

 

OptiPlex

 

7040

 

and

 

7050

 

Micro

 

PCs

 

and

 

the

 

Wyse

 

7000

 

Series

 

thin

 

clients.

 

M.2

 

is

 

known

 

as

 

the

 

“next

 

generation

 

form

 

factor”

 

and

 

is

 

a

 

specification

 

for

 

internally

 

mounted

 

computer

 

expansion

 

cards

 

and

 

associated

 

connectors.

 

Desktop

 

PCs

 

are

 

being

 

replaced

 

by

 

smaller

 

computing

 

devices

  

(such

 

as

  

Thin

 

Clients,

 

Micro

 

PCs,

 

Ultrabooks,

 

and

 

Tablets)

 

which

 

typically

 

have

 

internal

 

M.2

 

interfaces

 

but

 

do

 

not

 

have

 

PCI

 

or

 

PCIe

 

slots.

  

Many

 

users

 

still

 

need

 

fiber

 

Ethernet

 

access,

 

and

 

without

 

the

 

external

 

PCIe

 

slot,

 

there

 

is

 

no

 

standard

 

fiber

 

interface

 

on

 

these

 

devices.

 

See

 

the

 

Dell

 

OptiPlex

 

7040M

 

Owner's

 

Manual

 

for

 

important

 

notes,

 

cautions,

 

and

 

warnings.

 

Read

 

the

 

section

 

Before

 

working

 

inside

 

your

 

computer”

 

before

 

proceeding.

  

 

 

Summary of Contents for NM2-GXE-2230-01 Series

Page 1: ...s 13 Compliance Information 13 Declaration of Conformity 14 Record of Revisions 14 Introduction The Transition Networks NM2 GXE 2230 xx 01 and 01 D are 1 Gigabit Ethernet Fiber NICs supporting the PCI Express M 2 specification They are designed to install in the Dell OptiPlex 7040 and 7050 Micro PCs and the Wyse 7000 Series thin clients M 2 is known as the next generation form factor and is a spec...

Page 2: ... PCs and the Wyse 7000 Series thin clients The NM2 GXE 2230 xx 01 or NM2 GXE 2230 xx 01 D consist of a M 2 NIC that installs into the OptiPlex Micro PC s M 2 E key interface a fiber optic adapter that installs into the OptiPlex Micro PC s Option port and a 20 pin Flat Flex Cable FFC with right angle bend that connects the NIC to the fiber adapter The fiber optic adapter is available with either a ...

Page 3: ...iber Optic Adapter Width 1 65 42 mm x Depth 2 05 52 mm x Height 0 51 13 mm FFC Cable Length 6 15 3cm without right angle bend 5 5 14 CM with right angle bend Power Consumption LC 250mA 3 3V 0 8 Watts typical Power Consumption SFP 120mA 3 3V 0 4 Watts typical without SFP module Power Source M 2 interface connector 3 3V refer to Table 41 of M 2 specification Operating Temp 0 C to 45 C 32 F to 113 F ...

Page 4: ...below diagram See the Dell OptiPlex 7040M Owner s Manual for details 1 Processor 11 Power switch 2 CPU fan connector 12 Hard drive connector 3 Internal speaker connector 13 M 2 socket3 connector 4 Memory module connectors 14 Coin cell battery 5 USB 3 0 connector 15 RJ 45 Ethernet connector 6 Intrusion switch 16 USB 3 0 connector 7 USB 3 0 connector 17 DP VGA daughter board connector 8 Line out con...

Page 5: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 5 of 15 NIC Hardware Installation Overview NIC Hardware Location ...

Page 6: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 6 of 15 Components Overview Reference Views ...

Page 7: ...ailure to observe this caution could result in damage to the NIC Before installing the NIC review the Pre Installation Checklist and Safety Precautions below Before installing the NIC ensure that system power is OFF the power cord is unplugged from the power outlet and that proper electrical grounding procedure has been followed WARNING High voltage inside the system may present a safety hazard Ma...

Page 8: ...card If the NIC is damaged report it to Transition Networks 6 CAUTION Wear a grounding device and observe electrostatic discharge precautions when installing the NIC in a system Failure to observe this caution could result in damage to the NIC Before installing the NIC ensure that system power is OFF the power cord is unplugged from the power outlet and that proper electrical grounding procedures ...

Page 9: ...Alternatively you can attach the loose end of the FFC cable to the Fiber Optic Adapter and then install the M 2 NIC or the Fiber Optic Adapter 1 Remove PC cover 2 Install the M 2 NIC Assembly with attached cable into Motherboard M 2 Edge Connector 3 Secure the M 2 NIC Assembly into place using the Securing Screw 4 Install the Fiber Optic Adapter into the VGA opening in PC Case as shown below 5 Att...

Page 10: ...andoff with Top Hole in PC Case 7 Slip 4 Nylon Washer on top of 4 Standoff and insert 4 Screw to secure 8 Tighten using Black SEMS Screw 6 32x1 4 9 Insert the end of 20 Position FFC Cable into fiber optic adapter with Pins facing down 10 See the figure below for final placement 11 Replace PC cover ...

Page 11: ... Windows Device Manager When you install the Intel PROSet software tabs are automatically added to the supported Intel adapters in Windows Device Manager These features allow you to test and configure wired Intel Ethernet Adapters The links below apply to the NM2 GXE 2230 xx 01 the NM2 FXS 2230 SFP 01 and D versions At each link there is a 32 bit and a 64 bit download for each OS Intel Network Ada...

Page 12: ...ed duplex protocol or cable type 5 Use the troubleshooting procedures in the Dell OptiPlex User s Guide 6 Use the troubleshooting procedures on the PXE Boot Loader webpage as required 7 Use the troubleshooting procedures on the Intel i210 PROSet Drivers webpage as required 8 Verify that the link partner is active and can send receive traffic make sure partner settings match verify that the port is...

Page 13: ..._______________________________________________ Connected Device s _____________________________________________________________________________ 3 Provide your TN service contract number ____________________________________________________________ 4 Describe the failure _____________________________________________________________________________ ___________________________________________________...

Page 14: ...ation of Nuclear Facilities Aircraft Navigation or Aircraft Communication Systems Air Traffic Control Life Support or Weapons Systems High Risk Activities Transition Networks and its supplier s specifically disclaim any expressed or implied warranty of fitness for such High Risk Activities Record of Revisions Rev Date Notes A 6 5 17 Initial release for production B 12 11 17 Update driver informati...

Page 15: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 15 of 15 ...

Reviews: