background image

1

FORM NO. 3322–658

Model  No. 79174

INSTALLATION

INSTRUCTIONS

   

Loose Parts

Note:

Use the chart below to identify parts used for assembly.

DESCRIPTION

QTY.

USE

Kicker

Carriage bolt 5/16–18 x 3/4” (19mm)

Spacer

Locknut 5/16” (7.9 mm)

4

4

4

4

Install kickers

High–lift blade

3

Replace standard blades on mower

Baffle, left side

Baffle, right side

Bolt 5/16–18 x 1-1/4” (31.8mm)

Bellville washer

Locknut 5/16” (7.9mm)

1

1

4

4

8

Install Recycler

 baffles

Decal

1

Install onto mower

Preparing the Mower

1.

Remove the mower from tractor; refer to
Removing the Mower, in Mower Operator’s
Manual.

2.

Thoroughly clean the mower. All debris must be
removed to ensure that the baffles and kickers
will fit properly against cutting chamber.

3.

Tip the mower upside down and block up the
ends to ease installation of the 

Recycler

 baffle.

IMPORTANT: There are bolts (washers and
locknuts) installed in some of the open holes
of the cutter deck for safety.  Remove this

hardware if the hole is needed for installation
of the Recycler

kit.  Save these fasteners and

reinstall them in the same open holes when
any portion of the Recycler

kit is removed.

Reviews: