background image

©  6x4 Bar 

Version  6  11//0

5/2020 Julian Shepherd

 

7These instructions are for your safety. Please read through them thoroughly before use. 

PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE 

Summary of Contents for 6x4 Bar

Page 1: ...6x4 Bar Version 6 11 05 2020 Julian Shepherd 7These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE...

Page 2: ...j zyku prosimy o wys anie maila lub pisa na adres podany poni ej RUS TR Ba ka bir dilde talimatlar veya bir kopyas n bir kopyas i in bir e posta g nderebilir veya a a daki adrese yaz n z EN For a copy...

Page 3: ...bly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY...

Page 4: ...ly prior to or after assembly The building must have been re treated and re sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warp...

Page 5: ...6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level and...

Page 6: ...Stacked Parts List Scale 1 70 unless stated Description part No Qty 06...

Page 7: ...Fascia Bag Parts List no scale Description part No Qty Stacked Parts List Scale 1 70 unless stated Description part No Qty 07...

Page 8: ...5 x60 40mmRound head nail A0032 x24 25mm Posi drive screw A0035 x68 60mm Posi drive screw Nail bag contents Description part No qty 13 A0023 x124 13mmFelt Nail A0031 x08 Posi drive screw Black 25mm A0...

Page 9: ...You will need Hammer Spirit level Ladder 1mm 3mm 5mm 8mm drill bits Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you...

Page 10: ...10 In more detail GB IE...

Page 11: ...11 In more detail GB IE...

Page 12: ...example Make sure the floor is situated as shown The open long side of the floor is the front Door Panel A2422 x01 02 25mmScrews A0032 x08 Front Floor panel A0085 x01 GB IE Place the square shaft into...

Page 13: ...handles A0089 to the outside of the shutter so the 25mm black screws go into the framework Fix a A0014 Bolt at each corner framework with 4x25mm screws each 03 D handle A0089 x02 Bolt A0014 x04 25mm B...

Page 14: ...the floor and the cladding overhangs the floor Push the door panel A2422 up to it and ensure both panels are tight to the floor and the framework is flush before fixing Do not screw to the floor yet...

Page 15: ...eted building to sales shiregb co uk 15 60mm Screws A0035 x03 Plain Side A2424 x01 GB IE Again drill holes in both sides and the bottom of the plain side although only 3 holes are for this step Positi...

Page 16: ...to the floor with the 10 holes drilled previously 07 GB IE The A2423 front panel needs no holes in the end framework Again the bottom edge must be drilled inline with the floor framework Like the back...

Page 17: ...5 RH gable panel making sure both holes are within 1m of the steep end Align the framework and fix to the panel below 08 GB IE Repeat at the other end with the A2426 LH gable 09 60mmScrew A0035 x02 60...

Page 18: ...into the frame below and not too low as to be outside the bottom edge The lower holes just nip the screws up so not to crack the cladding Mark a line 95mm up from the bottom edge and drill 4 holes and...

Page 19: ...x the up the gable slopes as before NOTE using nail lines as a guide drill through the support bars Mark and drill 180mm from the low edge and screw to the soffit 12 GB IE From the inside drill and fi...

Page 20: ...front lower strip first folding the felt over the roof edging with an even overhang front and back then secure with a couple of nails at the top to hold the felt in position and at the bottom nail at...

Page 21: ...he ridge Nail at approximately 100mm spaces as before 16 GB IE The second piece overlaps the lower one and goes over the ridge Nail at approximately 100mm centres and a couple at the top to hold 15 2...

Page 22: ...the A2427 A2428 braces Place some masking tape below the opening in the front at each outer edge and mark and drill two holes either side as dimensioned below Align the braces flush with the opening a...

Page 23: ...h bolt with a pencil Drill a hole 8mm diameter about 20mm deep for each one 19 GB IE Place the A2429 bar shelf on top of the braces and into the aperture of the front panel so the framework is flush S...

Page 24: ...lay the fascia s on the floor so you can turn them over to ensure you have them the right way around Drill with a 1 mm drill to stop splitting Fix each fascia with 4 nails each and 2 each for the diam...

Reviews: