background image

Summary of Contents for Sonic Allstarts

Page 1: ......

Page 2: ...nk SET UP 23 Link main board adjustment 24 2 Adjustment 25 SET UP 1 SET UP the coin entry price for each game 25 SET UP 2 Additional tickets 26 SET UP 3 Multiple of tickets 26 SET UP 4 Game Time SET U...

Page 3: ...e check to ensure wires are in the proper positions After set up is completed you can plug in and turn on the machine Turn off the machine before moving to prevent damage I Product Check list Before u...

Page 4: ...2 Front net stander bridge long 3A Front right net stander kit 3B Front left net stander kit 4A Base holder BF 4B Base holder FB 4C Base holder FF 4D Base holder BB 4E Base holder FF Bottom 5A Wooden...

Page 5: ...bly type parts list 4B Base holder FB 4C Base holder FF Top cover Main frame 5B Ball holder kit 5C Ball guide kits 6A Ball net holder kit 6B Main part Metal Shelf optional Basketball Lower Side Net Fr...

Page 6: ...Token size 22mm 27mm III Introduction of Product Appearance Position direction Top cover optional Running display board 2 Digital display board LED 3 Digital display board LED Coin LED display Ticket...

Page 7: ...assembly type Step 1 Screw Lower Side Net on the basket board front Assembly parts 2BR Back right net stander kit 2BL Back left net stander kit 3A Front right net stander kit 3B Front left net stander...

Page 8: ...8 Step 2 Screw 1B Basket kits on the basket board front screw M5 15 6 nut M5 6 Assembly parts 1A Sensor for basket 1B Basket kits 2A Basket board...

Page 9: ...t and right 2 Screw 2C Front net stander bridge short on Back left Right net stander kits Assembly parts 2A Basket board 2BR Back right net stander kit 2BL Back left net stander kit 2C Front net stand...

Page 10: ...3B Front right left net stander kit on basket board left and right connect with screw fixed it as drawing Assembly parts 3A Front right net stander kit 3B Front left net stander kit Insert position s...

Page 11: ...wing Assembly parts 2C Front net stander bridge short 2E 2 Front net stander bridge long 4A Base holder BF 4B Base holder FB 4C Base holder FF 4D Base holder BB 4E Base holder FF Bottom BF FB screw M6...

Page 12: ...step by step as drawing Wooden base A type Ball holder kit Ball guide kits screw M6 26 12 nut M6 12 washer M6 5 13 5 12 screw M6 26 6 nut M6 6 washer M6 5 13 5 6 6E Rubber pad Assembly parts 5A Woode...

Page 13: ...ain part Metal Shelf optional Ball net holder kit Metal Shelf optional Main part screw M8 90 4 nut M8 4 sleeve 15 43 4 screw M8 16 4 nut M8 4 washer M10 20 4 Hexagonal Phillips screw with 2 Washers in...

Page 14: ...oard plug and the ball holder kit plug located underneath the front of the ball net holder through the hole in back of the main part 3 Now connect plugs as shown in drawing Ball holder kit Ball holder...

Page 15: ...tep by step as drawing Step 10 1 connect the I O control board with Top cover 2 Now connect plugs as shown in drawing Assembly parts Top cover optional Top cover optional I O control Board Top cover I...

Page 16: ...16 2 Assembly and disassembly for Half Assembly type Step 1 Turn the left and right frame180 to the position as drawing picture connect with screw fixed it as drawing screw M8 70 4 nut M8 4...

Page 17: ...17 Step 2 Screw the base frame FB and base frame FF as drawing picture Assembly parts 4B Base holder FB 4C Base holder FF FB FF screw M6 26 2 nut M6 2 screw M6 48 2 nut M6 2...

Page 18: ...ep 3 Screw the 5B Ball holder kit and 5C Ball guide kits as drawing picture Assembly parts 5B Ball holder kit 5C Ball guide kits Ball holder kit Ball guide kits screw M6 26 12 nut M6 12 washer M6 5x13...

Page 19: ...ain part Metal Shelf optional Ball net holder kit Metal Shelf optional Main part screw M8 90 4 nut M8 4 sleeve 15 43 4 screw M8 16 4 nut M8 4 washer M10 20 4 Hexagonal Phillips screw with 2 Washers in...

Page 20: ...oard plug and the ball holder kit plug located underneath the front of the ball net holder through the hole in back of the main part 3 Now connect plugs as shown in drawing Ball holder kit Ball holder...

Page 21: ...tep by step as drawing Step 7 1 connect the I O control board with Top cover 2 Now connect plugs as shown in drawing Assembly parts Top cover optional Top cover optional I O control Board Top cover In...

Page 22: ...ink adjustment for IC board function Fix position after assembly 1 Hoist the machine from the hoist point 2 Keep at least 50cm 20 space from the back for maintenance and to avoid over heating Electric...

Page 23: ...d as the main frame P S If two link machines 2 PCB are connected the main control one DIP SW must be set as OFF OFF OFF ON The link machines must stand side by side The main part back view Link Plug c...

Page 24: ...SW2 SW1 OFF OFF OFF OFF Single mode OFF OFF OFF ON link 1 Unit OFF OFF ON OFF link 2 Unit OFF OFF ON ON link 3 Unit OFF ON OFF OFF link 4 Unit OFF ON OFF ON link 5 Unit OFF ON ON OFF link 6 Unit OFF...

Page 25: ..._ _ _ _ _ 1 Press then release 2 C O I N Alternately 1 P L A Y _ _ 1 _ _ _ _ 2 1 _ _ _ _ _ _ 2 Press then release 3 C O I N Alternately 1 P L A Y _ _ 1 _ _ _ _ 3 1 _ _ _ _ _ _ 3 Press then release 4 C...

Page 26: ...n release _ _ 3 _ _ _ _ 3 Press then release _ _ 3 _ _ _ _5 Press then release _ _ 3 _ _ _ 1 0 Press then release _ _ 3 _ _ _ 2 0 Press then release _ _ 3 _ _ _ 3 0 No ticket game play only SET UP 2 i...

Page 27: ...every 10 points scored If the operator sets the game for 3____20 the player will get 1 ticket for every 20 points scored and so on For additional 0 3 tickets enter SET UP 2 Press for 1 second then re...

Page 28: ...AUTO test STE MOT 2 _ _ 6 _ _ _ _ _ Press then release Start ball holder motor AUTO test Warning alarm will start after 5 seconds if there is an error Press for 1 second then release to enter SET UP...

Page 29: ..._ 1 Press then release Link PCB DIS SWITCH SW1 ON SW2 OFF XXXXXX _ _9 _ _ _ _ 2 Press then release Link PCB DIS SWITCH SW1 OFF SW2 OFF XXXXXX _ _ 9 _ _ _ _ 3 Turn off the power after setting and turn...

Page 30: ...r into audit 1 COUNT IN 1 C X X X X X X Press then release enter into audit 2 COUNT OUT 2 C X X X X X X Press then release enter into audit 3 SHIFT IN 3 C X X X X X X LED test function display LED dis...

Page 31: ...The Error specification as below Error 1 C O I N 1 Error 2 C O I N 2 Error 3 SET MOT 1 Error 4 SET MOT 2 Record total dispensed tickets up to 999999 counter reset is allowed Warning alarm action Left...

Page 32: ...nated 2 2 play types available A Single play DIP SW set to single play B Link mode DIP SW set to link mode up to 15 machines can be linked Press link mode display link countdown time any other machine...

Page 33: ...tep 3 4 7 screw M8 70 4 Semi assemble machine Step 1 Knock down machine Step 7 8 screw M8 90 4 Semi assemble machine Step 4 16 Knock down machine Step 4 7 9 nut M8 12 Semi assemble machine Step 1 4 38...

Page 34: ...34 VIII Wires Layout Sonic Basketball Wire diagram EU For 220V 1 2...

Page 35: ...35 Sonic Basketball Wire diagram EU For 220V 2 2...

Page 36: ...36 Sonic Basketball Wire diagram US For 110V...

Page 37: ...1121 13801202 1 2 Wooden basket board SEGA 2246 13800501 1 3 Main wooden board SEGA 1134 13801701 1 4 I O control board SEGA 2213 13800101 1 5 Running display board SEGA 2212 13800201 1 6 3 Digital d...

Page 38: ...38 Item Name Part Number Quantity 1 Frame for main wooden board fix use SEGA 1134 13850411 1 2 Board cover SEGA 1134 13850561 1 3 Basket cover SEGA 1134 13850571 1 4 Box cover SEGA 1134 13850581 1...

Page 39: ...Bearing D Type for Basket SEGA 1151 13800101 1 7 Sliding railway for basket SEGA 1134 13801601 2 8 Bearing cover SEGA 1132 13802601 2 9 Basket motor holder SEGA 1132 13801101 1 10 Basket holder SEGA...

Page 40: ...cker SEGA 1032 13800941 1 3 Sensor for basket WO RNPW2 SEGA 0955 13800001 2 4 Basket sensor railway SEGA 1134 13807141 1 5 Bearing SEGA 1151 13800301 2 6 Bearing 6002ZZ SEGA 1243 13800101 2 7 Holder f...

Page 41: ...V 2A SEGA 0923 10000191 1 11 Transformer 110V 15V 3A 2 SEGA 0923 10000181 1 12 Transformer 110V 15V 3A 2 SEGA 0923 10000181 1 13 The knob for wooden box SEGA 1119 00000001 1 14 Base for transformer fi...

Page 42: ...4 13850621 1 8 Filter YG03T5 3A SEGA 0924 00000101 1 9 Fuse R3 11 20mm SEGA 0974 00001001 1 10 Ticket control board SEGA 2213 13100201 1 11 Ticket container SEGA 1134 19300051 1 12 Ticket dispenser SE...

Page 43: ...for counter SEGA 1134 13850621 1 8 Filter YG03T5 3A SEGA 0924 00000101 1 9 Fuse R3 11 20mm SEGA 0974 00001001 1 10 Ticket control board SEGA 2213 13100201 1 11 Ticket container SEGA 1134 19300051 1 1...

Page 44: ...Motor KGB 215 6130B1 SEGA 0912 00001061 1 6 Motor Frisked for ball holder kit SEGA 1134 13850661 1 7 Bearing D Type for ball holder SEGA 1151 13800201 1 8 Ball holder bearing SEGA 1134 13804201 1 9 A...

Page 45: ...AM BK1 LED Holder B 1132 13805301 2 3 AM BK1 LED Holder fixed 1132 13805001 4 4 MR16 LEDWhite Light 3W 0962 00005401 4 5 LED White Light Bulb Holder 0962 00001041 4 Item Name Part Number Quantity 1 AM...

Page 46: ...3 AM BK1 4LED Board Blue 2212 13800701 5...

Reviews: