MINI CORE TWO ROLL
TOILET TISSUE DISPENSER
INSTRUCTIONS
MOUNTING INSTRUCTIONS
The user is responsible for proper installation and use of this dispenser. For best results, mount the
dispenser level and on a flat surface.
Equipment Needed:
Measuring Tape, Level, Screwdriver, Eye Protection, Pencil, Drill and Drill Bit,
Appropriate Mounting Fasteners
1.
Position the unit on wall with front cover open. Use a pencil to mark mounting locations through
the holes on the back of the unit. Make sure unit is level before marking holes.
WARNING: Proper function of this dispenser requires level mounting.
Use mounting holes
closest to the outer edges for best results.
2.
Drill the marked spots on the wall with an appropriate sized drill bit for the wall material and
mounting hardware.
3.
To complete the installation, use mounting hardware appropriate for the wall on which the
dispenser will be mounted. A flat washer should be used between the head of the fastener
and the inside of the dispenser.
PAPER LOADING
1.
Open cover and place Roll Lockout in
upright position
2.
Load paper rolls and orientate so that
paper comes off toward outside of unit
3.
Feed paper on left roll through opening
in the bottom of unit
4.
Close the front cover
Roll Lockout in upright position