background image

 

26-0903 Issue 1 

 

 
 
 

          

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

                             

Fire Detection & Alarm System Control Panel V1.000 

  

 
 
 
 

 
 
 
 
 
 
 
 
 
 

INSTALLATION INSTRUCTIONS         

(TO BE RETAINED BY THE INSTALLATION ENGINEER) 

 
 
 
 
 
 
 
 
 
 

Summary of Contents for Quadnet

Page 1: ...26 0903 Issue 1 Fire Detection Alarm System Control Panel V1 000 INSTALLATION INSTRUCTIONS TO BE RETAINED BY THE INSTALLATION ENGINEER...

Page 2: ...pect of such contents Due to the complexity and inherent importance of a life risk type system then training on this equipment is essential and commissioning should only be carried out by competent pe...

Page 3: ...Batteries 15 PSU Termination Schematic 26 Network 17 Topology and Cable Specification 17 Network Connection Schematic 18 Commissioning 19 Installation 1 st Stage 19 Installation 2 nd Stage 19 Commiss...

Page 4: ...warranty unless the system is installed commissioned and serviced in accordance with this manual and the relevant standards by a suitably qualified and competent person or organisation Anti Static Ha...

Page 5: ...ntelligence signifies that the signal processing is spread throughout the system in order that the decisions about fires and faults are taken within the detector itself The detector is capable of bein...

Page 6: ...ocate the control panel where extremes of temperature or humidity may occur or where there is any possibility of condensation or water ingress Like all electronic equipment the control panel may be af...

Page 7: ...lation Instructions 7 Cabinet Installation The four mounting holes in the back box should be used to secure the cabinet to a solid wall using suitable screws of at least 50mm in length Physical Dimens...

Page 8: ...nections must be installed with a maximum length of 500m between network ports The Power Supply Unit requires both a data connection and dual power connections Thus one x 2 core 1 5 mm 2 screened fire...

Page 9: ...control of the quantity and will provide prompts if the limits are reached DESCRIPTION ALU RATING Sounder Low 0 5 Sounder Medium 1 Sounder High 2 Beacon 1 Loop I O Module 1 Conventional Zone Module P...

Page 10: ...2 X 2C2 5 QUADNET CONTROL PANEL QUADNET PSU 1 X 2C1 5 2 X 2C2 5 ADDRESSABLE LOOPS ALL 2C1 5 ADDRESSABLE LOOPS ALL 2C1 5 ADDRESSABLE LOOPS ALL 2C1 5 NETWORK 2C1 5 QUADNET PSU OPTIONAL UP TO 4 MAX PER...

Page 11: ...Quadnet Installation Instructions 11 Addressable Circuit Loops 1 4 END1 END 1 SCRN END2 END2 SCRN END1 END1 MI SCREEN ON BOARD PCB FIELD CONNECTIONS SCREEN END2 MI END2 SCREEN SCREEN...

Page 12: ...urn due to the possibility of data corruption Addressable spur radial circuits may be connected from any multipoint detector but not from any other device Devices covering a maximum of 1 zone per spur...

Page 13: ...Instructions 13 Power Supply Unit General Assembly Cabinet Installation The four back plate holes should be used to secure the cabinet to a solid wall using suitable screws of at least 50mm in length...

Page 14: ...Quadnet Installation Instructions 14 Physical Dimensions 50mm 50mm...

Page 15: ...the connection leads supplied We recommend the use of type Yuasa NP3 2 12 FR or other equivalent approved type Note that batteries are electrically live at all times and great care should be taken to...

Page 16: ...S BAT BAT 24V FUSE1 BATTERY 10A T QUADNET PSU CONTROLLER EARTH LEAD SCRN B A SCRN OV 24V SCRN OV 24V INPUT CONNECTORS ENSURE THAT THE INCOMING EARTH CABLE IS CONNECTED DIRECTLY TO THE EARTH STUD IN TH...

Page 17: ...n A cable complying with the BS 5839 Pt1 2002 Amendment 2 2008 Category 1 cables required to operate for prolonged periods during fire conditions is required This must be a 2 core 1 5mm 2 screened fir...

Page 18: ...Quadnet Installation Instructions 18 Network Schematic All network cables should be 2 core 1 5mm2 screened and fire rated NETWORK RING PANEL 001 PANEL 002 PANEL 003 PANEL 004 PANEL 005 PANEL 006...

Page 19: ...equired for general electrical installations The control panel back box should be mounted with the mains supply tested connected and isolated at the un switched fused spur ready for the commissioning...

Page 20: ...ription Ground Floor DEVICE ADDRESS SERIAL NUMBER DEVICE DESCRIPTION 24 CHARACTERS MAX ZONE DEVICE TYPE SMOKE MODE HEAT MODE ALARM CONF N 1 212 Shop Floor Main Entrance 1 MCP 2 30960 Staff Area Rear L...

Page 21: ...em Controls Event log 1000 events Inputs and Outputs Relay Outputs x 4 Monitored Outputs Monitored Inputs volt free contacts SPCO 30vDC 2A max volt free contacts SPCO 2 x 24v conventional monitored ou...

Page 22: ...nd at one end will be spaced further apart than the others The resistor should be viewed with this band to the right as follows reading from the left and side of the resistor Band 4 Band Codes 5 Band...

Page 23: ...y clipped or in containment All loop bases and back boxes installed and terminated All devices have positive core links in place Loop insulation and continuity testing complete and form filled out As...

Page 24: ...tery etc cleared from control panel Correct operation and device poll verified using SitaDIAGNOSTIC Step 2 Description Commissioning Engineer Checked Data Uploaded to PC Configuration set up on pc Dat...

Page 25: ...ion the system CONTINUITY READING OHMS CORE LOOP 1 LOOP 2 LOOP 3 LOOP 4 LE1 ve to LE2 ve LE1 ve to LE2 ve LE1 Scrn to LE2 Earth A reading of approximately 1 ohm per 100 meters of 1 5 mm 2 cable is exp...

Page 26: ...2 ve to ve with temp short circuit applied ve to Earth with temp short circuit applied ve to Earth with temp short circuit applied A reading of approximately 1 ohm per 100 meters of 1 5 mm 2 cable is...

Page 27: ...e system CONTINUITY READING OHMS CORE Main Ring ve to ve ve to ve Screen to Screen A reading of approximately 1 ohm per 100 meters of 1 5 mm 2 cable is expected and any significant variation from this...

Page 28: ...E DETAILS CONTROL PANEL NO DESCRIPTION LOOP NO DESCRIPTION DEVICE ADDRESS SERIAL NUMBER DEVICE DESCRIPTION ZONE DEVICE TYPE SMOKE MODE HEAT MODE ALARM CONF N Eg 1 35415 Gnd Flr Front Office 1 MPWS SM2...

Page 29: ...Quadnet Installation Instructions 29 Your Notes...

Page 30: ...Quadnet Installation Instructions 30 Your Notes...

Page 31: ...Quadnet Installation Instructions 31 Your Notes...

Page 32: ...panel with radial spur circuits only from Multipoint detectors Make sure that the screen cables are sleeved connected together and connected to earth only at the control panel The commissioning engin...

Reviews: