manualshive.com logo in svg
background image

 

 

 

 

 

 

 

 

 

 
 

 

 

 

PowerWalker VFI 10K-80K CPG PF1 3/3

 

 
 
 

 

 

 

 

 

Uninterruptible Power Supply System

 

 

Version: 1.0 .1

 

Содержание VFI 10KL CPG PF1 3/3

Страница 1: ...PowerWalker VFI 10K 80K CPG PF1 3 3 Uninterruptible Power Supply System Version 1 0 1...

Страница 2: ...E 26 5 2 MAINTENANCE 26 6 SPECIFICATIONS 27 Please comply with all warnings and operating instructions in this manual This equipment should only be installed serviced and maintained by qualified perso...

Страница 3: ...n the final installation phase connect grounding wire to the external UPS battery cabinets or appropriate grounding terminals The UPS can be installed only by qualified maintenance personnel An approp...

Страница 4: ...g conductor cable on the UPS or the building wiring terminals under any circumstance The UPS system features its own internal current source batteries The UPS output sockets or output terminal blocks...

Страница 5: ...lowing chapter 2 1 Unpacking and Inspection Unpack the package and check the package contents The shipping package should contain One UPS One user manual One monitoring software CD option please check...

Страница 6: ...4 2 2 Wiring Terminal View Diagram 1 10K 15K 20K L Diagram 2 10K 15K 20K L Rear Panel DUAL Rear Panel Diagram 3 10K 15K 20K L Diagram 4 10K 15K 20K L Input Output Terminal DUAL Input Output Terminal...

Страница 7: ...5 Diagram 5 30K L Rear Panel Diagram 6 40K L Rear Panel Diagram 7 30K L 40K L Dual Input Input Output Terminal...

Страница 8: ...6 Diagram 8 60KL front view Diagram 9 80KL front view with door open with door open Diagram 10 60KL 80KL Input Output Terminal...

Страница 9: ...e as the input power source for the UPS as its rated current is less than the UPS s maximum input current The receptacle may be damaged and destroyed 2 Switch off the mains switch in the building befo...

Страница 10: ...15K L 20K L Terminal block wiring diagram for 10K L 15K L 20K L Terminal block wiring diagram for 30K L 40K L Terminal block wiring diagram for 30K L 40K L Terminal block wiring diagram HV 60KL 80KL T...

Страница 11: ...ion to the rated battery voltage marked on the rear panel If you want to change the numbers of the battery pack please make sure you modify the setting simultaneously The Connection with wrong battery...

Страница 12: ...gram of parallel system for 10K L 15K L 20K L a Wiring diagram of parallel system for 10K L 15K L 20K L Wiring diagram of parallel system for 30K L 40K L Wiring diagram of parallel system for 30K L DU...

Страница 13: ...iring diagram of parallel system for 60KL 80KL 2 5 Software Installation For optimal computer system protection install UPS monitoring software to configure UPS shutdown operation Please download the...

Страница 14: ...er into the sub screen MAIN Initializing INFORMATION CONTROL SETTING DATA LOG MEASURE ON OFF UPS BATTERY TEST MUTE ALL MEASURE1 MEASURE2 MEASURE3 BASIC ADVANCE BASIC1 BASIC2 ELECTRICAL BATTERY MISCELL...

Страница 15: ...n 0 0 Screen 1 0 Control screen with common control operation Screens 1 1 1 to start and stop the unit through the control panel Enter YES to turn on or turn off UPS And screen will jump to main scree...

Страница 16: ...attery test are Battery testing The battery test is running Battery Test failed The battery test has been failed Screen 1 1 3 to order cancel mute of UPS Enter YES to make UPS mute Press BACK or No ic...

Страница 17: ...hases to neutral for three phase or single phase units 0 1V Bypass voltages phase to phase units 0 1V Bypass voltages phases to neutral for three phase or single phase units 0 1V Output voltages phase...

Страница 18: ...can program the time hh mm ss hours minutes seconds and the date dd mm yy day month year You can select the display language between the available options it may vary You can select input source Line...

Страница 19: ...level an authorized password will be required to modify some advanced parameters Screens 3 1 2 Advance settings Screens 3 1 2 1 You can select the output voltage between the following options 208V 220...

Страница 20: ...an select the ECO frequency range The range of frequency goes from 46Hz to 54Hz when UPS is 50Hz system and goes from 56 Hz to 64 Hz when UPS is 60Hz system You can select Whether UPS is enable or dis...

Страница 21: ...rmation To modify the rated values on the screens it is necessary to introduce the Password on the previous screen 3 0 otherwise they only will be able to be visualized The basic information shows UPS...

Страница 22: ...ere are all the possible alarms displayed in the display LCD 3 3 Audible Alarm Description Buzzer status Muted UPS status Bypass mode Beeping once every 2 minutes Yes Battery mode Beeping once every 4...

Страница 23: ...f the UPS is overload the buzzer will beep twice every second 4 When the UPS is overload please remove some loads immediately It is recommended to have the total loads connected to the UPS less than 8...

Страница 24: ...ns that there are problems for UPS operation Users can get the warning indicator from LCD panel Please check the trouble shooting table in Chapter 4 for details 2 Some warning alarms can t be muted un...

Страница 25: ...er the UPSs enter to Battery mode and add to the parallel system d If you have the third UPS follow the same procedure of c Then the parallel system is complete If more detail information is needed pl...

Страница 26: ...e short circuited None 64 Voltage waveform abnormal in B phase None 18 Inverter B C output line to line short circuited None 65 Voltage waveform abnormal in C phase None 19 Inverter C A output line to...

Страница 27: ...ed position to disable the EPO function The warning code 01 The external or internal battery is incorrectly connected Check if all batteries are connected well The warning code 09 UPS is overload Remo...

Страница 28: ...acks which are potentially dangerous Before carrying out any kind of service and or maintenance disconnect the batteries and verify that no current is present and no hazardous voltage exists in the te...

Страница 29: ...7 Ah 12 V 9 Ah 12 V 7 Ah 12 V 9 Ah N A Numbers 10 10 pcs 16 16 pcs x 2 strings Recharge Time 9 hours recover to 90 capacity Charging Current max 2 0 A 10 Recommended 1 0 12 0A Adjustable Charging Vol...

Отзывы: