background image

Plasson Super Easy Start

Adjustable For Turkey Poults

(Up to 7 weeks)

Operation Instructions

G l o b a l   P r e s e n c e   -   L o c a l   C o m m i t m e n t

2012

4. After taking the birds out:

  •  Clean the lines following Plasson Guide to Cleaning Water Lines

  •  Keep the lines filled with water except under freezing conditions

1. Check your installation:

  •  After completing the installation, fill the lines in order to check the 

system.

  •  The SESA system is assembled on the Plasson Nipple system.
  •  Always use the long connecting piece (02209015) for the 

Aluminum profile.

  •  Nipple type for this application: Grey.
  •  Recommended number of Turkey Poults per SESA: 25-30.
  •  Recommended number of SESA per 3 m (10’) section: 4-6.
  •  Maximum length of line 80 m (260 ft.). For longer lines, a Plasson 

Mid Line Pressure Regulator can be used.

  •  If water is supplied from the main pipeline, incoming pressure to 

the header kit should be 1.5 bar (22psi),

    max. 2.7 bar (40psi).
  •  If water is supplied from a header tank, the header tank should be 

at least 4 m (13 ft.) above floor level.

  •  A 130 micron or 120 mesh filter cartridge or better must be 

installed before the header kit.

  •  Lines must be suspended at a constant height above the house 

floor (slats/litter).

  •  For lines with more than 15 cm (6”) of fall or slope, be sure to 

install the header kit on the high end of the line and allow the 
water to flow downward. Maximum permitted drop of line without 
using Plasson Slope Regulator: 15 cm (6”).

  •  Shocker wire must be installed. The aluminum profile must be 

grounded. It is recommended to perform the grounding using 
Plasson Grounding Nipple.

2. Before operating the system and prior to placement of 

birds:

  •  At the start of each new flock and after medication, the system 

must be flushed thoroughly with high pressure, one line at a time 
(for details see Plasson Guide to Cleaning Water Lines). To flush:

    °

  Open drain valve at end of line

    °

  Turn valve on Pressure Regulator to “flush” position (half turn)

    °

  We suggest a minimum of 10 minutes per line. Once completed, 

turn the valve to “regulate” position and close drain valve at the 
end of the line.

  •  Set the water pressure (initial setting) to 30 cm (12”). (Water level 

in sight tube should be measured from the center of the Nipple 
line pipe)

3. During the flock:

  •  It is very important that the Turkey Poults will be able to see the 

water in the SESA - adjust the height of the SESA line and the light 

program accordingly.

  •  Recommended water pressure: 25-40 cm (10"-16").

  •  Training towards grow out:

    ° 

If finishing barn is equipped with HF* we recommend adding 

one HF per 3 m (10’) section for the last week of brooding.

    ° 

If the finishing is done in the same shed and using HF, we 

recommend adding one HF per 3 m (10’) section from the 3rd 

week of brooding and continue replacing the SESA with one HF 

every two/three days (see HF Operating instructions). The extra 

unused Nipples should be covered with Plasson Snap on Plug 

for Nipple (02205294).

    ° 

Plasson Bell Drinker, lower 5 to 10 Bell Drinkers per house for 

the last week of brooding.

  •  Height of SESA System guidelines: follow the sketch hereunder

*  HF (Heavy Finish) - Plasson Nipple System for Adult Turkeys.

  •  Clean the filter periodically according to water quality

  •  It is good practice to run clean water through the Medicator after 

each medication

Please read all the instructions before using the Plasson 

Super Easy Start Adjustable for Turkey Poults system.

The following are general recommendations:

Adjust  the  line’s  height 

enabeling  the  Turkey 

Poults  to  easily  see  the 

water  upon  their  first 

search  while  ensuring 

the cup does not touch 

the  litter  as  this  will 

cause it to flood.

Day 1

Slightly  raise  the  water 

lines  in  order  to  train 

the  birds  to  drink  from 

the raised SESA. The lip 

of  the  SESA  should  be 

at  bird’s  chest  to  eye 

level.

Day 3 up to

6 days

Keep  the  SESA  lip 

slightly  above  eye  level 

while  enabling  free 

movement  under  the 

SESA.

7 days till

end of brooding

Reviews: