background image

 

 

 

Osmio Infinity Hydroxy Gas/Water Production 

 

Electrolysis System User Manual 

 

Version 0.

7

 

 

Telephone: 0330 113 7181 

 

Summary of Contents for Infinity Hydroxy

Page 1: ...Osmio Infinity Hydroxy Gas Water Production Electrolysis System User Manual Version 0 7 Telephone 0330 113 7181 ...

Page 2: ...ailure The system requires uninterrupted power supply in order to operate correctly Warranty The Osmio Infinity Hydroxy Gas Water Production Electrolysis System is fully guaranteed for 3 years against defective parts and materials including defects caused by poor workmanship Osmio Solutions Ltd will repair or replace defective parts or materials during the term of the 3 year warranty at no extra c...

Page 3: ...ses a caustic lye solution as the catalyst for efficient electrolysis Please ensure you handle this using appropriate safety equipment Highly Flammable keep away from any surfaces or equipment that generate heat or static electrical sparks e g electric radiators tongs Keep away the Osmio Infinity away from open flames never use near a gas fire gas cooker open fire or candles Combustible in air if ...

Page 4: ...3 OSMIO INFINITY SYSTEM USER MANUAL DATE VERSION NUMBER 06 02 2021 0 7 ...

Page 5: ...nd accessories 13 3 5 Assembly Instructions 14 3 6 Performing the Operational Check 18 3 7 System Settings 18 3 8 Relative Contraindications 19 3 9 Gas Volume and Calculating the Duty Cycle 20 4 0 Operating the System 26 4 1 Operating the System Inhalation 26 4 2 Operating the System Topically 27 4 3 Drinking Water 27 4 4 Shutting the System Off 28 5 0 Emergency Situations 28 6 0 Maintenance 29 6 ...

Page 6: ...35 6 8 Preparing for Storage and Transportation 36 7 0 Product Specifications 37 7 1 General specifications 37 7 2 System Specifications 38 8 0 Troubleshooting Guide 39 9 0 Glossary of Terms 42 Appendix A Medical Disclaimer 43 Appendix B System maintenance log 44 Appendix C System Operation Checklist Error Bookmark not defined Appendix D Frequently Asked Questions 47 ...

Page 7: ...and the requirements for safe installation and operation Basic routine maintenance classified according to the required frequency daily 100 hours 500 hours Troubleshooting table with the most frequent problems affecting the equipment with possible causes and actions that may resolve these problems Glossary of terms used This information along with good use and care helps to maintain the system in ...

Page 8: ...either being inhaled by the individual using a nasal cannula or using the spot applicator to topically treat specific areas on the body 2 0 Safety Precautions The Osmio Infinity Hydroxy Gas Water Production electrolysis system generates a mixture of hydrogen and oxygen gasses that are potentially combustible and explosive As long as the percentage of hydrogen in the air is less than 4 then the gas...

Page 9: ...and the gas production will re start For safety the pressure is kept very low and electrical shut off is used so gas production stops There is a mechanical gas pressure relief as a final precaution 2 2 Set Up Position on a stable flat surface For indoor use only in a well ventilated room or area Do not use outdoors or in situations where the user or system could become wet Avoid direct sunlight an...

Page 10: ...e occurs rinse thoroughly with cold water for 5 minutes Seek immediate medical attention 3 0 Installation The Osmio Infinity Hydroxy Gas Water Production Electrolysis system weighs approximately 6 kg and care must be taken when lifting it The Hydrogen gas produced can be detected by some carbon monoxide detectors which may alarm when there is an Osmio Infinity operating in the same room Please not...

Page 11: ...s other than those specifically designated in the instructions Doing so will void the system warranty 3 2 Check Delivery for Completeness or Damage Print off packing list and check against order Visually inspect the transport package the system and the accessories for any possible transport damage If any parts are missing or damaged contact Osmio Solutions Ltd within 48 hours If the system has bee...

Page 12: ...ic funnel 1 Power cord 1 50 ml syringe 1 Bubbling stone 1 Humidifier 1 to spot applicator tube 1 Lye 1 Gloves 1 Stirring rod 1 3 3 Environmental Conditions For indoor use only Temperature range 5 C to 40 C Installation category II Pollution Degree 2 Altitude 2000m When you set up the system avoid sites of operation with excess dust vibrations strong magnetic fields direct sunlight draft excessive ...

Page 13: ...lean vibration proof and leave additional room for cables tower cap and so on Ensure there is sufficient room to enable disconnecting the device The ambient air should be clean and free of corrosive vapours smoke and dust Do not operate the instrument in an environment where potentially damaging liquids or gases are present ...

Page 14: ...as Production Light 21 Nasal Cannula 6 Red Over Full Liquid Level Light 22 Humidifier 2 to Spot Applicator Remote Bubbler tube 7 Internal water level sight tube 23 Humidifier 1 to Humidifier 2 tube 8 Red Low Liquid Level Light 24 Lye 9 Timer Active Indicator Light 25 Tower Cap 10 Hour Meter 26 Tower Cap Gas Out Fitting 11 Red Internal Light 27 Tower Cap Check Valve 12 Tower Cap to Humidifier 1 tub...

Page 15: ...ess steel table knife or equivalent for stirring Measuring scales 3 5 litres of 0 TDS water Suitable container to measure the lye in PPE Mask for your nose and mouth respirator Safety glasses Gloves provided Step 1 Prepare Your Water You will require approximately 3 5 litres of 0 TDS water which can be produced in a number of ways Filter 4 litres of water using the Osmio Zero and place in a distil...

Page 16: ...fill line with 0 TDS water and screw on the lids taking care not to cross thread Lye is corrosive and should only be handled using the appropriate PPE If the eyes are exposed rinse thoroughly with cold water for 5 minutes Seek immediate medical attention Do not use the Humidifiers that come with the system to mix your lye solution as this will contaminate them and the heat emitted can melt the pla...

Page 17: ...n the system on so that the front display is illuminated Place the funnel in the top of the system Slowly pour in HOT tap water approximately 65C 1250 ml Check the sight tube to see the water level in the system do not overfill Allow the water to cool before discarding from the system down the sink Place the funnel back in the top of the system Slowly pour the cooled lye electrolyte solution into ...

Page 18: ...overfill please see troubleshooting guide section 8 page 37 Step 5 Attaching the Tower Cap and Humidifiers Screw the tower cap on to the top of the system being careful not to cross thread and tighten until sealed do not over tighten the tower cap Attach the tube P to the tower cap gas out fitting and to Humidifier 1 gas input Attach the tube R to the gas output on the top of Humidifier 1 and atta...

Page 19: ...cy is preset to 432 Hertz Ensure duty cycle is set to correct level for the individual using the system see section 3 8 Turn on the timer please see section 3 7 to avoid damage Check gas is bubbling in both humidifiers 3 7 System Settings The system has a feature that allows you to set the Frequency being pulsed to the electrolyser Frequency is usually referred to in AC as Hertz Hz or in the case ...

Page 20: ...by itself If you need to turn off gas production before the timer has finished counting down just turn off the main power switch For continuous function turn the timer counterclockwise one click To deactivate the continuous function just turn the timer switch clockwise one click Mechanical timer can be left on continuous function an system can be switched On and OFF using ON OFF button 3 9 Digital...

Page 21: ...n because more than 4 hydrogen in the intake breath is potentially explosive According to hydrogen gas physical properties when mixed with air in a concentration below 4 hydrogen gas is not explosive The charts on the following pages will help to calculate the safe but therapeutic breathing ratio of around 2 hydrogen in the intake breath Please use these charts to calculate the optimal Duty Cycle ...

Page 22: ...ing a higher only shortens the time it takes to saturate the blood by a few minutes After the blood is saturated even a 1 mixture is sufficient to keep the blood saturated 2 It takes time for the hydrogen in the blood to fully saturate into the body s tissues different organs have different timings for maximum saturation When inhalation stops the blood loses its hydrogen content in a few minutes R...

Page 23: ...15 0 250 55 27 5 458 80 40 0 666 6 3 0 50 31 15 5 258 56 28 0 466 81 40 5 675 7 3 5 58 32 16 0 266 57 28 5 475 82 41 0 683 8 4 0 66 33 16 5 275 58 29 0 483 83 41 5 691 9 4 5 75 34 17 0 283 59 29 5 491 84 42 0 700 10 5 0 83 35 17 5 291 60 30 0 500 85 42 5 708 11 5 5 91 36 18 0 300 61 30 5 508 86 43 0 716 12 6 0 100 37 18 5 308 62 31 0 516 87 43 5 725 13 6 5 108 38 19 0 316 63 31 5 525 88 44 0 733 1...

Page 24: ... 408 74 37 0 616 99 49 5 825 25 12 5 208 50 25 0 416 75 37 5 625 100 50 0 833 Estimated Weight vs Duty Cycle vs Gas Volume Chart for 2 Inhalation Kg lbs L Hr mL m Kg lbs L Hr mL m 2 3 5 1 0 5 8 59 0 130 26 13 0 216 4 6 10 2 1 0 16 61 2 135 27 13 5 225 6 8 15 3 1 5 25 63 5 140 28 14 0 233 9 0 20 4 2 0 33 65 8 145 29 14 5 241 11 3 25 5 2 5 41 68 0 150 30 15 0 250 13 6 30 6 3 0 50 70 3 155 31 15 5 25...

Page 25: ...3 0 383 49 9 110 22 11 0 183 106 6 235 47 23 5 391 52 1 115 23 11 5 191 108 6 240 48 24 0 400 54 4 120 24 12 0 200 111 1 245 49 24 5 408 56 7 125 25 12 5 208 113 4 250 50 25 0 416 A more accurate way to determine the correct personally optimised setting is Measure the volume of air you breathe in a single breath in lph at rest tidal breath Count the seconds it takes for several inhalations and fin...

Page 26: ... example a 2 safe breathing limit of HydrOxy is 18 lph this is equal to 12 lph of hydrogen Therefore you would set the duty cycle to 36 For all other applications set the DUTY to 100 except for breathing Adjusting the Duty Cycle adjusts the volume of gas produced by the system 0 is zero gas volume production and 100 is 100 gas volume production 50 litres per hour Ensure the correct duty cycle is s...

Page 27: ... Humidifier 1 and unscrew the tank 6 Allow the lid of Humidifier 1 tank to rest on the bracket at the side of the system or loosely on top of the Humidifier 7 Use the syringe to draw up 50 ml of water 8 Syringe the water into the system through the check valve 9 Check the water level in the sight tube and continue to fill to a level between low and full taking care not to overfill it takes a few s...

Page 28: ...y on top of the Humidifier 7 Use the syringe to draw up 50 ml of water 8 Syringe the water into the system through the check valve 9 Check the water level in the sight tube and continue to fill to a level between low and full taking care not to overfill it takes a few seconds for the level to change in the sight tube 10 Set DUTY to 100 11 Insert the long clear tube into the Spot Applicator funnel ...

Page 29: ...ave the system plugged in when not producing gas Only water from Humidifier 2 can be consumed if the TDS is 1 Never leave the system running producing gas when not in use 5 0 Emergency Situations In case there is any abnormal situation during the operation such as fluids spilling on or inside the system Switch off the system Unplug the system immediately from the power supply Contact Osmio Solutio...

Page 30: ... for assistance if necessary This section contains an outline of the points mentioned in the checklist below General Maintenance checklist Item 5 hrs of use Daily 100 hrs or every 2 months 500 hrs or every 12 months Keep the system free of dust x Change water in Humidifier 1 every x Change water in Humidifier 2 x 100 hours flush x Return system for maintenance every 500 hrs or every 12 months x Ma...

Page 31: ...ion 6 2 for instructions Inspect the power cable and do not use the system if the power cord or plug is loose dirty or damaged danger of electrocution fire Check the system before use bubbling should be visible in both humidifiers Weekly Cleaning Switch off unplug and clean the outside of the system with a suitable disposable disinfectant wipe or microfibre damp cloth allowing the unit to dry befo...

Page 32: ...king soda in 1L of cooled boiled water Allow 30 minutes contact time If you are using any other sanitising solution please refer to manufacturer for contact time and safety instructions If you have been unwell please replace the cannula with a new one Each user should have their own cannula 6 2 2 Cleaning Humidifier and bubbler To sanitise using Osmio Sanser 300 mg l solution 1 Prepare 0 5 litre o...

Page 33: ...nical Setting Daily or after every patient Cleaning Wipe dust from the system when not in operation Cannulas should be utilised according to local clinical policy Disinfect the humidifiers and replace the water use 0 TDS water Visual Checks Check all parts are present and securely fitted do not overtighten inspect the power cable and do not use the system if the power cord or plug is loose dirty o...

Page 34: ... system with the syringe provided Replace the water in Humidifier if TDS Wash Humidifier 2 as per 6 2 or 6 3 Check the TDS of the water in Humidifier 2 before each inhalation session and replace if TDS is 2 Only consume water if the TDS 1 Do not use Humidifier 1 water for drinking or feeding plants animals etc as its function is to absorb any residual electrolyte 6 5 Topping up the Liquid Level Wh...

Page 35: ...en if the system is full Tilt the system forward to speed up the levelling Do not overfill You can run the system while filling water through the check valve Sometimes the water does not go down into the electrolyser immediately when you are syringing it into the tower causing it to look like the machine is overfilled If this happens stop filling and run the machine As gas travels up into the towe...

Page 36: ...an water 3 4 times 10 Using the funnel refill the system with the lye solution discard any sediment 11 Refit the Tower Cap to the top of the system 12 Replace Humidifier 1 in the bracket 13 Re attach tubing to Tower Cap and Humidifier 1 14 Update the Maintenance Log 6 7 How to Pack for 500 hour Service Every 500 hours of use the system requires an engineering inspection and service Please contact ...

Page 37: ...parate sheet of paper 6 8 Preparing for Storage and Transportation For short shutdowns less than one month you can leave the lye solution in the system just make sure all the outputs are sealed The biggest issue with storage is lye crystallisation Crystallisation can plug orifices make the floating ball stick to the sight tube and cause internal shorts Crystallisation occurs when the water leaves ...

Page 38: ...tions without prior notice as part of our continuous product development program 7 1 General specifications General Specifications Overall Dimensions 215mm wide x 320mm deep x 270mm high Weight 6 kg empty Operating Conditions 5 C to 40 C Mains Power Supply 220 240 Volts Gas Output 0 50 litres per hour Supply Frequency Range 50 60 Hertz Power Drawn 300 Watts at 100 Duty Cycle ...

Page 39: ...ff 2 psi Mechanical pressure relief valve 3 psi if electrical shut off fails Automatic high and low level liquid level shut off Red LEDs and audible indicator for high and low liquid level Illuminated blue LED liquid level sight tube with floating level indicator Reliable anti backfill system prevents overfilling from Humidifier Tower cap to pre separate lye mist from the Hydroxy Gas and to see an...

Page 40: ...ediately to arrange for return for inspection and repair Leaks at the bottom of the system Contact Osmio Solutions immediately Alarm sounding and red overfull light is on This is a safety feature and happens when you have accidentally overfilled the system Turn off the infinity and remove the power cord from the back of the unit Remove all the tubes and the humidifier Unscrew the tower cap Place a...

Page 41: ...production The gas being produced will disturb the water in the Tower Cap and the water will flow back into the system You will then see the water level in the system rise No light on the main power switch Check the machine is properly plugged in Check the power cord is firmly attached to the back of the system If the power switch is still not lighting up then replace the 10 AMP fuse do not fit a ...

Page 42: ...ecuring any that are loose Then check all areas using a soapy water solution Put a generous squirt of washing up liquid into 125 ml of water and using a small brush apply the solution over any joints or areas where the gas could leak tower cap threads tube connections lids fittings seals etc When the soap film covers the leak you will see tiny bubbles forming at the leak Once the leak has been fou...

Page 43: ...r closed incorrectly Opening the case voids all warranties 9 0 Glossary of Terms Disinfection The destruction of pathogenic bacteria usually with an antiseptic chemical or disinfectant Gas Production Volume Gas volume and gas pressure are interrelated but they are two different things and often get confused Volume is how much gas there is present and pressure is how much force exerted by the gas V...

Page 44: ...tained on or in any product label or packaging You should not use the information in our literature or on our website for diagnosis or treatment of any health problem for prescription of any medication or other treatment Always consult with a healthcare professional before starting any diet exercise or supplementation program before taking any medication or if you have or suspect you might have a ...

Page 45: ... 44 Appendix B System maintenance log DATE HOURS SIGNATURE PRINT AND SIGN 100 200 300 400 500 RETURN SYSTEM FOR MAINTENANCE 600 700 800 900 1000 RETURN SYSTEM FOR MAINTENANCE 1100 1200 1300 1400 1500 RETURN SYSTEM FOR MAINTENANCE 1600 1700 1800 1900 2000 RETURN SYSTEM FOR MAINTENANCE ...

Page 46: ...USER MANUAL FOR THE OSMIO INFINITY HYDROXY GAS WATER PRODUCTION ELECTROLYSIS SYSTEM 45 DATE HOURS SIGNATURE PRINT AND SIGN ...

Page 47: ...ier 1 with 0 TDS water to fill line if liquid level was topped up Check the TDS of the water in Humidifier 2 and replace if TDS is 2 Set DUTY to correct setting for the individual Attach cannula spot applicator bubbling stone to Humidifier 2 gas out Put the cannula on attach spot applicator Turn on timer clockwise to the required time 10 20 30 or 60 minutes For continuous operation turn counter cl...

Page 48: ...that will generate static electricity like stroking a pet or shuffling across the carpet Once you are grounded you have equalised your electrical potential with the Osmio Infinity and there will not be a spark if you touch the parts Note that a high humidity environment also helps mitigate static electricity How long does it take to charge a litre quart of water Bubble the water for 10 minutes per...

Page 49: ...INITY HYDROXY GAS WATER PRODUCTION ELECTROLYSIS SYSTEM 48 Contact Details Osmio Solutions Ltd Buckland Lake Reserve Buckland Road Cliffe Nr Rochester ME3 7RT Telephone 0330 113 7181 Email info osmiowater co uk www osmiowater co uk ...

Reviews: