GENERAL

These  devices  are  used  in  places  where 
emergency  luminaires  are  needed.  The 
luminaires

 

GR-298/60L/90/WP  and  GR-

298/30L/180/WP are suitable for open area 
lighting

.

  Each  device  must  be  permanently 

connected  to  mains  power  supply

.

  In 

normal operation the battery is charging. In  
case    of    a    mains    power    supply  failure   
the  device    will    light  the  illumination  led   
automatically  in  emergency  mode.    When 
the  mains  power  supply  is  restored the 
device turns to normal operation.

INSTALLATION

To install the luminaire follow the installation 
instructions 

ο

n page 2.

Battery Charging

The 

battery 

charging 

is 

completely 

controlled

In  this  case,  is

 

achieved  the 

perfect  battery maintenance

as well as the 

elongation of its duration

When the battery 

has  completely  charged

it  charges  with  a 

maintenance current.

Battery Cut-off

The device enter in this operation when the 

mains  power  supply  fails

 

and  battery  has 

lost  its  energy

During  this  operation  the 

device  enters  the  idle  state

 

and  battery 

consumption  is  negligible,  in  order  to  be 
protected from deep discharge.

Automatic Operational Test

It is conducted automatically every 15 days. 
In  order  to  be  performed,  the  mains  power 
supply and the battery should be connected. 
       

Automatic Autonomous Test

The 

Automatic 

Autonomous 

Test 

is 

conducted  and  measures  the  device’s  back 
up  operation  and  emergency  duration.  The 
BATTERY  FAULT  LED  blinks  during    the 
measurement,  indicating  this  process  to  the 
user.  This  test  is  conducted  automatically 
every  six  months

In  order  to  be  performed, 

the  main  power  supply  and  the  battery 
should  be  connected  and  fully  charged

If 

the  battery  is  not  fully  charged

the  test  is 

postponed

 

until  the  battery  is    completely 

charged.  If  during  this  test,  the  autonomy  is 
less  than  nominal  then  the  battery  fault  led 
turned on continuously and the battery must 
be replaced. 

SPOT LIGHT WATERPROOF SELF TESTING NON MAINTAINED   

EMERGENCY LUMINAIRES WITH WHITE LEDs

TECHNICAL CHARACTERISTICS

 FOR LED MODULE SPECS (see page 4)

220-240VAC

 

50-60Hz

3 hours

24 hours

Charge, lamp fault, battery fault

TEST button

Deep discharge and over charge protection

IP 65

4.8V/1.2Ah

  60 white LEDs

  30 white

 

LEDs

o

5 to 40  C

Up to 95% 

ABS/PC, PC

3 years

 (1 

year for the battery

)

4

55

 gr.

Ø125 x 65 mm

EN 60598-1, EN 60598-2-22

, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3

1.5 hour

350lm 

170lm 

 GR-298/60L/90

/

WP

 GR-298/30L/180

/

WP

3.

3

W / 3.

7

VA

OPERATION TEMPERATURE RANGE
RELATIVE HUMIDITY
CONSTRUCTION MATERIAL

EXTERNAL DIAMENTION
WEIGHT

GUARANTEE

OPERATION VOLTAGE
MAXIMUM POWER CONSUMPTION
BATTERY (Ni-MH)

CHARGE TIME

INDICATIONS - CONTROLS

BATTERY PROTECTION

MINIMUM DURATION

DEGREES OF COVER PROTECTION

PRODUCED IN ACCORDANCE WITH

EMERGENCY ILLUMINATION

LIGHT SOURCE

Thank you for your trust in our products  

Olympia Electronics - European manufacturer

Summary of Contents for GR-298/60L/90/WP

Page 1: ...s conducted and measures the device s back up operation and emergency duration The BATTERY FAULT LED blinks during the measurement indicating this process to the user This test is conducted automatically every six months In order to be performed the main power supply and the battery should be connected and fully charged If the battery is not fully charged the test is postponed until the battery is...

Page 2: ...on The luminaire lights its illumination source when it is powered by the mains power supply or not The light source contained in this luminaire shall only be replaced by the manufacturer or his agent or a similar qualified person INSTALLATION INSTRUCTIONS Initial installation 1 Untighten the screw but do not remove it and pull up the reflector 2 Always use in any case round mains cable with a dia...

Page 3: ...the retaining screw Figure 4 and detach the part for suspended ceiling installation Step 3 Figure 5 Drill 2 holes on the base using a 4mm drill bit in order to permit the retaining screws to pass Mark these two drilled points on the required mounting location drill the holes and install the supplied plastic plugs Step 4 Install the decorative rim package included Step 5 ATTENTION In order to susta...

Page 4: ...attery replacement It can be done only by a competent person and after the mains interruption 1 Remove the luminaire from the suspended ceiling figure 3 2 Follow the step 1 of the installation instructions 3 Disconnect the connector and remove the old battery 4 Connect the new battery with the same type step 2 of the installation instructions and place it in the position of the old one 5 Replace t...

Page 5: ... repairs or re setting done by a third party unless Olympia Electronics has fully agreed to them in writing Products that have been damaged can be returned to the premises of our company for repair or replacement as long as the warranty period is valid Olympia Electronics reserves the right to repair or to replace the returned goods and to or not charge the buyer depending on the reason of defecti...

Reviews: