NSGV SERIES “CYCLONE” DUST COLLECTOR 

I, O & M MANUAL 

Standard Equipment Includes:

- Cyclone Assembly
- Base Assembly
- Inlet Assembly
- Power Pack

- Surge Hopper

- Cabinet Base

- Double-Drum Base

- Hopper Base

Optional Equipment Includes:

- Attenuator
- Exhaust Accessories
- Filter Bag(s)
- Filter Bag Enclosure
- Explosion Relief Panels

 

 

 

 

 

 

 

 

National System of Garage Ventilation 

714 N. Church St. / P.O. Box 1186 

Decatur, IL 62525 

(217)423-7314 / (800)728-8368 / (fax)(217)422-5387 

NSGV.com 

   [email protected] 

Summary of Contents for CYCLONE Series

Page 1: ...ack Surge Hopper Cabinet Base Double Drum Base Hopper Base Optional Equipment Includes Attenuator Exhaust Accessories Filter Bag s Filter Bag Enclosure Explosion Relief Panels National System of Garage Ventilation 714 N Church St P O Box 1186 Decatur IL 62525 217 423 7314 800 728 8368 fax 217 422 5387 NSGV com JMDILLIGAF aol com ...

Page 2: ...indoor box like collectors can be set directly on the floor on soft rubber pads If the unit rocks shim as necessary Collectors with legs or floor anchors must be anchored or bolted to the foundation Shim as necessary All field assembled joints must be caulked airtight Straighten any bent flanges Wipe any mating surfaces clean then use a proper caulk that has a temperature rating exceeding the oper...

Page 3: ...el Blower Aligned Incorrectly Flow Flow Other Collectors Sections ELECTRICAL Independently ground this equipment with at least 0 bare copper conductor to a buried grounding rod or a grounded water pipe system Grounding to the building steel is not sufficient All connections must be made correctly This is necessary to protect personnel and to help protect against explosions and or fires If the moto...

Page 4: ...e flanges Orient the plenums as shown below NOTE CAULK ALL FLANGES PRIOR TO BOLTING TOGETHER Closed Edge Typical Closed Edge Typical Closed Edge Typical Air Inlet From Blower Outlet No Filter Collar On This Module Front View Top View Open Bolt Bolt Bolt Bolt 3 National System of Garage Ventilation 714 N Church St P O Box 1186 Decatur IL 62525 217 423 7314 800 728 8368 fax 217 422 5387 NSGV com JMD...

Page 5: ...h piece that is added After completing this assembly procedure hoist and temporarily support the After Filter module assembly previously assembled The After Filter assembly may now be bolted to the Noise Attenuator assembly The assembly should look as shown below NOTE CAULK ALL FLANGES BEFORE BOLTING TOGETHER IN EACH STEP After Filter Module Plenum Transition Large Noise Attenuator and Blower Cycl...

Page 6: ...13 Plastic Tubing 4 pcs 6 Skin Side 54 Long 14 Connecting Rod for Manual Shaker 9With nut 7 Skin End 54 Long 15 2 Knob foe End of Connecting Rod 8 10 x 1 2 Sheet Metal Screws 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 LOCATE ARRANGE CUT OUT FOR RETURN AIR DUCT PER BUILDING PLANS ASSEMBLE SHAKER ON OPPOSITE SIDE THAN SHOWN FIELD DRILL BOLT AIR FLOW 5 National System of Garage Ventilation 714 N Church St P...

Page 7: ...tubes taut re check levelness and height of 12 and then cut off and discard all but 1 of excess tubing 13 which sticks through the collars in 12 Shove a nail or other metal rod into each tube and bury 12 s set screws through the plastic into the nail or metal rod 7 Choose the door side and mount 9 48 above the pad on that side Hang doors 10 Left Hand door overlaps Right Hand door with about 1 4 bo...

Page 8: ...rt Up Check List step by step you can apply full continuous power After a short period of operation 15 minutes or so turn off all power and check that all bolts anchors and other connections are all tight It is extremely important that the blower motor and support and all bolted connections associated with the unit be securely tightened Re check again after another 15 minutes of operation and agai...

Page 9: ...nly be done after contacting a local sales or service shop of the motor manufacturer They will be able to give details of warranty service and parts When the surface is dry and clean the new adhesive backed gasketing sticks instantly Cut butting ends square and allow 1 4 extra length so the gasket is compressed when fitted Filter Cleaning If shaking does not correct a fall off in airflow or if col...

Page 10: ...ust storage container is leaking or 55 gallon drum cover is loose Check for large leaks in the storage chamber Check the 55 gallon drum cover gasket and that the drum cover is fastened securely Motor Runs Hot Starter Kicks Out Electrical circuit overload Check that the power supply circuit has sufficient power to run all equipment Unit not wired for available voltage Correct wiring for proper supp...

Reviews: