background image

 

 

 
MPB S.r.l. 

Via Giacomo Peroni 
400/402 
00131 Rome - Italy 
 

 
 
Tel  +39 0641200744 
Fax +39 0641200653 
[email protected] 

 

 

www.gruppompb.uk.com 

 

MPB 2019 ver. 1.02 

 

 
 
 
 

 

 

 
 

User manual 

 

NMR-03 

 

Non-Magnetic and Non-Reflective Tower 

up to 4 meters 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

applicable to version 1.0 of NMR-03

 

Summary of Contents for NMR-03

Page 1: ...i 400 402 00131 Rome Italy Tel 39 0641200744 Fax 39 0641200653 info gruppompb com www gruppompb uk com MPB 2019 ver 1 02 User manual NMR 03 Non Magnetic and Non Reflective Tower up to 4 meters applicable to version 1 0 of NMR 03 ...

Page 2: ...USER MANUAL N M R 03 2 Release history Version Description 1 0 First version 1 02 New mounting details ...

Page 3: ...d tested and left the factory in conditions that fully comply with European standards To ensure the correct use of the product these general instructions must be read and applied before and for any use of the instrumentation The NMR 03 is made for industrial environments and laboratories and should be used by authorized staff only MPB disclaims any responsibility for a use of the device different ...

Page 4: ...R 03 is a tower for the support of sensors and antennas in environments where no metallic or reflective materials are allowed Entirely made of fiberglass tubes DELRIN PLA PEEK polyethylene Nylon and ABS This non magnetic and non reflective system does not affect the measurement of the emitted field 2 Components NMR 03 Base ...

Page 5: ...USER MANUAL N M R 03 5 NMR 03 T650 NMR 02 hub NMR 03 hub top NMR 02 upper junction poles ...

Page 6: ...USER MANUAL N M R 03 6 NMR 03 2T2000 NMR 03 pole joint NMR 03 sliding support NMR 03 clamp with support ...

Page 7: ...USER MANUAL N M R 03 7 NMR 03 T500 tube NMR 03 winch NMR 03 threaded bar NMR 03 M8 knob NMR 03 M8 knob with M8x60mm screw NMR 03 rope ...

Page 8: ...R MANUAL N M R 03 8 NMR 03 counterweight 3 Mounting Follow the steps below to mount the NMR 03 in the easiest and most comfortable way Step 1 Place the base on a flat surface Step 2 Insert T650 on the base ...

Page 9: ...R 03 9 Step 3 Place 2t2000 on the ground and insert the pole joint Step 4 Insert the hub top and the hub on the 2T2000 Attention use the side where the junction are at 700mm Step 5 Insert the sliding support on 2T2000 ...

Page 10: ... 10 Step 6 Insert the assembly of step 5 on that of step 2 Step 7 Insert the threaded bars on the hub and screw on the base Tighten well them until complete tightening After that insert the knobs on the threaded bars that ...

Page 11: ...per junction poles Step 9 Move at 90 the base and Insert last 2T2000 as in figure Step 10 In the same position of step 9 place the winch on the ground cut the band on the rope insert the free end of the rope through the bearing on top of the assembly temporarily fix the rope at the sliding support ...

Page 12: ...ertical position Straighten the pole and fasten the winch to the desired height with the appropriate supports Step 12 Insert the rope into the appropriate holes as shown in the figure Make 3 knots place them in the middle of the pole as show in the picture ...

Page 13: ...p 13 Insert the T500 tube in the clamp with support Push the tube all the way down center the holes and insert in the screw the bolt into the hole making sure you have set T500 After that insert the pin by force in the other hole ...

Page 14: ...tal bar in the sliding support Turn the winch crank to tension the rope After that cut the band on the winch Step 15 Insert the counterweig hts and relative fixing knobs Step 16 Insert the antenna into the clamp and tighten the appropriate fixings The ...

Page 15: ...vertical and horizontal polarization Insert the antenna cable into the antenna holder to avoid twisting the cable Step 17 Scroll horizontally with the counterweig hts and with the bar to balance the weight refer to the level placed in the highlighted point ...

Page 16: ...USER MANUAL N M R 03 16 Step 18 Lift the antenna with the winch to the desired height ...

Page 17: ...the toothed wheels 2 Check before lifting that the 3 nodes of the sliding support are tight 3 Make sure that you have tightened the winch on the pole and that when lifting the antenna the winch does not move 4 Balance the base using the 4 adjustable feet Further information www gruppompb uk com Technical information assistenza gruppompb com Phone 39 06 41200744 ...

Reviews: