background image

Solarstation S

Technische Information für Montage und Betrieb

DE

PR 24002.816  10-0

5

-20

1

6

Tech

ni

sch

e Ä

nd

eru

ng

en

 v

or

be

ha

lte

n

Solar station S

Technical information for installation and operation

GB

Station solaire S

Documentation technique pour le montage et la mise en service

FR

Technische Information für Montage und Betrieb

.

Effiziente Energietechnik

Meibes System-Technik GmbH

Ringstraße 18 · D-04827 Gerichshain · Tel. +49 (0) 3 42 92 7 13-0 · Fax  7 13-808 
Internet: www.meibes.de · E-Mail: [email protected]

Summary of Contents for Solar station S

Page 1: ...l information for installation and operation GB Station solaire S Documentation technique pour le montage et la mise en service FR Technische Information f r Montage und Betrieb Effiziente Energietech...

Page 2: ...g nderung und Pr fung elektrischer Ger te VDE 0185 Allgemeines f r das Errichten von Blitzschutzanlagen VDE 0190 Hauptpotentialausgleich von elektrischen Anlagen VDE 0855 Installation von Antennenanla...

Page 3: ...geben Das ausf hrende bzw zugelassene Gewerke z B Installateur hat dem Kunden die Wirkungsweise und Bedienung des Ger tes verst ndlich zu erkl ren 1 2 Bestimmungsgem e Verwendung 1 3 Erstinbetriebnahm...

Page 4: ...unbeabsichtigtes Schlie en gesichert sein Die Bet tigung ist nur von geschulten Fachpersonal vorzunehmen F r den Betrieb der Anlage m ssen die Kugelh hne komplett ge ffnet sein Kapitel 3 erste Abb Obe...

Page 5: ...anuell ge ffnet werden vgl Abs 3 2 Dieses ist vor allem beim Entleeren der Anlage zu beachten und anzuwenden Die Markierung der Flie richtung Pfeilrichtung befindet sich auf der Spindel des Kugelhahne...

Page 6: ...C sein damit besteht erh hte Verbr hungsgefahr Der Entl fter sitzt am h chsten Punkt der Anlage Nach dem sorgf ltigen und fachgerechten Entl ften ist der Anlagen druck jeweils wieder auf den Betriebsd...

Page 7: ...hes hinter grundbeleuchtetes schwarz wei Display Bedienung ber Dreh Dr cksteller und ESC Taste 3 Eing nge f r PT 1000 F hler Analog bzw PWM Ausgang f r Hocheffizienzpumpe Drehzahlregelung ein vorkonfi...

Page 8: ...tial conductors VDE 0185 General information for the installation of lightning protection systems VDE 0190 Main equipotential bonding of electrical systems Additional guidelines and notes VDI 6002 Par...

Page 9: ...d 1 2 Intended use 1 3 Initial commissioning 1 4 Working on the system 1 5 Liability The solar station S is supplied pre assembled as a 1 or 2 branch type with or without high efficiency pump Optional...

Page 10: ...is attached firmly Top shut off fittings The top shut off fittings are equipped with integrated manually openable backflow preventer The direction of flow is indicated by a stylised arrow shape on th...

Page 11: ...x 45 see Fig 9 from the end of position Bear this in mind and use it especially when draining the system Cracking pressure ever approx 300 mm water column 0 Ball valve open non return valve in operati...

Page 12: ...ed be sure the pipeline system is completely drained The heat transfer fluid should be collected in a suitable container and disposed of according to the manufacturer s instructions in an environmenta...

Page 13: ...th Grundfos UPM3 Hybrid 15 70 PWM With Wilo Yonos Para ST 15 7 PWM with permanent air vent Without pump With Grundfos UPM3 Hybrid 15 70 PWM With Wilo Yonos Para ST 15 7 PWM 45705 24 EA 45705 94 45705...

Page 14: ...e en service de mat riaux lectriques mise la terre conducteurs de protection con ducteurs d quipotentialit VDE 0185 g n ralit s concernant la mise en service d installations de protection contre la fo...

Page 15: ...aux prescriptions 1 3 Initial commissioning 1 4 Travaux sur l installation 1 5 Responsabilit La station solaire est livr e en unit pr fabriqu e avec 1 ou 2 lignes avec ou sans pompe haut rendement R...

Page 16: ...ixation V rifiez la fixation Vannes d arr t sup rieures Les vannes d arr t sup rieures sont quip es de freins Clapet anti retour int gr s et r gler manuellement Le sens d coulement est marqu par une f...

Page 17: ...liquer surtout lors de la vidange de l installation Cracking pressure ever approx 300 mm water column Pression d ouverture env 2x 200 mm colonne d eau 0 Robinet ouvert clapet anti retour en fonctionne...

Page 18: ...V rifier l tanch it des branchements composants et raccordements En cas de fuites vider l installation effectuer les r parations et recommencer l essai de pression 4 4 Vidange Lors de la vidange de l...

Page 19: ...de remplissage et de vidange possibilit de raccordement un vase d expansion au c t aspiration de la pompe d bitm tre affichage double du m lange de propyl ne glycol 40 et de l eau Comme ci dessus mai...

Page 20: ...39 38...

Page 21: ......

Reviews: