background image

DMJOIL101EN - v1 

VISIO L1H OPERATOR - 

INSTALLATION MANUAL 

Installation manual 

Op. Visio L1H

 

Summary of Contents for Op. Visio L1H

Page 1: ...DMJOIL101EN v1 VISIO L1H OPERATOR INSTALLATION MANUAL 1 Installation manual Op Visio L1H ...

Page 2: ...LLATION MANUAL VISIO L1H OPERATOR TRANSLATED DOCUMENT Read thoroughly all of these instructions before using the unit This manual includes all the necessary information required to install the product Keep this manual in a safe place for future reference 0 INDEX ...

Page 3: ...DMJOIL101EN v1 VISIO L1H OPERATOR INSTALLATION MANUAL 3 ...

Page 4: ...op S1 S2 S2 MINIMUM SAFETY DISTANCE HEAD AND BODY AS PER DET 2 4 1 S1 MINIMUM SAFETY DISTANCE HANDS AND FINGERS AS PER DET 2 4 2 Sp OVERLAP FIXED LEAF SLIDING LEAF DEP ON FRAME Dop OPERATOR DEDUCTION DEP ON FRAME Check that the dimensions correspond to the order See delivery note AT x HL PL AH Opening Width HV Beam Height Fig 1 1 1 2 INSTALLATION DIMENSIONS Sp Overlap between door leaves depending...

Page 5: ...ding leaf width AF AH PL Fixed leaf width 1 3 1 4 1 1 4 2 1 4 1 4 1 DET Fig DET DET Fig Fig Fig 1 2 S1 Safety distances depending on Frame S2 Safety distance depends on S as follows For D20 T20 F20 R20 T35 D35 S1 0mm For E20 S1 50mm For I30 S1 55mm For C44 S1 105mm For S44 S1 105mm If S 250 S2 200 mm If S 250 S2 500 mm 1 3 1 Door width 1 3 DOOR DIMENSIONS ...

Page 6: ...ing line HL Door clear height HT HL 125 Overall door height HR HT 5min Minimum ceiling height HV HL 28 Beam height 1 5 1 6 Check the floor level beam and walls overhang FIG 1 7 Check AH for the whole opening as per Fig 2 Check that minimum HV HL 28 for the whole opening Fig Fig Fig 1 4 CHECKS Fig Fig 1 3 2 Door height 1 8 1 9 ...

Page 7: ...e main profile Fig 2 5 1 Track profile Length AT 20mm 2 Insulation profile Length AT 20mm Fig 2 4 Fig 2 5 Fig 2 4 2 2 2 Position 2 2 1 Introduce 2 2 TRACK PROFILE ASSEMBLY Drill hole size Ø9 along main profile as shown in diagrams Fig 2 2 Fig 2 1 Tools Drill bit no 9 Fig 2 3 Fig 2 2 Fig 2 1 Space drill holes 2 1 DRILLING 2 PREPARE MAIN PROFILE ...

Page 8: ...hown in the diagram Adjust the top wheel as shown in diagram Introduce the trolley on the top stile as shown in diagram Slide the trolley along the whole length of the main profile as shown in the diagrams Use a hand to help position the track rail Fig 2 8 Fig 2 7 Fig 2 6 Fig 2 6 Fig 2 6 2 3 ADJUST TRACK PROFILE ...

Page 9: ...hown in the diagram Self thread top lintel to the C beam x10 self threading screws placed at equal intervals along the length of the profile as shown in the diagrams Fig 3 3 Fig 3 3 Fig 3 2 Fig 3 4 Fig 3 3 Fig 3 2 3 2 1 Mark and screw Fig 3 1 Set out the sections as shown in the diagram Fig 3 1 3 1 PROFILES LAYOUT 3 MAIN PROFILE AND TOP LINTEL ASSEMBLY ...

Page 10: ...uts bolts Nuts bolts DIN6923 M8 SO7380 M8 20 3 3 3 Screw Drill where marked along the length of the UPN at Ø8 as shown in the diagrams Fig 3 8 Fig 3 7 Herrramientas Drill Ø8 Fig 3 8 Fig 3 7 3 3 2 Drill Fig 3 5 Drill holes in the beam using the main profile as template as shown in the diagrams Fig 3 6 Fig 3 5 Fig 3 6 3 3 1 Introduce and mark 3 3 MAIN PROFILE ASSEMBLY ...

Page 11: ...44 Drill section A as shown in the diagram See table for different frame dimensions Fig 4 3 Fig 4 3 Tools Drill bit no 8 5 5 Cut section at A and B A AF 40 B PL 40 AF Fixed Leaf width PL Clear Fig 4 2 1 Fig 4 1 Fig 4 2 Fig 4 4 4 1 2 Drill Det 4 1 MOUNT LOWER LINTEL 4 1 1 Cut 4 BOTTOM LINTEL PREPARATION ...

Page 12: ...L 12 Woodw E20 Woodw D35 Woodw I30 Woodw 40 Woodw 44 Nuts bolts DIN6923 M8 Fig 4 4 4 1 3 Screw Screw the bottom lintel to the fixed leaf as shown in the diagram Leave 40mm in the PL part of the door leaf Check table for different frame dimensions Fig 4 4 ...

Page 13: ...nding on frame dimensions Reference vertical Reference vertical Reference vertical Reference vertical Reference vertical Reference vertical Mark and drill the floor on the inside of the AT in accordance with dimensions Mark and drill with respect to the reference vertical according to frame dimensions Fig 5 2 DET 5 2 1 Fig 5 1 5 1 MOUNT FIXED LEAVES 5 1 1 Drill 5 FIXED LEAVES BOTTOM LINTEL PL ASSE...

Page 14: ...TALLATION MANUAL 14 Fig 5 6 Fig 5 5 Fig 5 4 Fig 5 3 Check door leaves PL are parallel throughout the clear height Fig 5 6 Position the fixed leaves as shown in the diagrams Fig 5 3 5 4 5 5 5 1 2 Position fixed leaves 5 1 3 Check for plumb ...

Page 15: ...5 Fig 5 11 Fig 5 10 Tornilleria D 7504N 4 2x16 Fig 5 9 Fig 5 9 5 10 5 11 Fig 5 8 Fig 5 7 Nuts bolts D 7504N 4 2x16 Screw x3 fixed leaves to top lintel Fig 5 7 5 8 Screw x3 bottom lintel PL to top lintel 5 1 4 Screw 5 2 1 Screw 5 2 BOTTOM LINTEL PL ASSEMBLY ...

Page 16: ...Introduce lateral end stops and screws nuts into main profile 6 3 Position stops at the two ends of the main profile 6 4 Screw to the nut inside the channel and tighten the screw over the track rail 6 5 DIN7380 6x10 DIN6798 M 6 DIN933 6x12 Nuts bolts Nuts bolts Nuts bolts Fig Fig Fig 6 1 2 Lateral stops assembly Fig Fig 6 1 6 2 6 1 1 Insert nuts into profile 6 1 LATERAL STOPS ASSEMBLY 6 LATERAL ST...

Page 17: ...LLATION MANUAL 17 Nuts bolts Nuts bolts DIN7380 6x10 DIN6798 M 6 Fig 6 8 Fig 6 7 Fig 6 6 Fig 6 8 Fig 6 7 Fig 6 6 6 2 LOCK ASSEMBLY Introduce lock and screws nuts into centre of main profile Position the lock at AT 2 Screw nuts inside channel ...

Page 18: ... Separators on trolleys assembly See the distribution of trolleys as per the scheme shown in the diagram For an easy assembly number them 1 to 2 Fig 7 1 Fig 7 2 Fig 7 1 7 1 1 Distribute the trolleys in the operator 7 1 TROLLEYS ASSEMBLY 7 1 1 Distribute the trolleys in the operator OPENING TO THE LEFT OPENING TO THE RIGHT Fig 7 2 Fig 7 1 7 1 2 Separators on trolleys assembly Fig 7 3 Fig 7 4 7 DRAG...

Page 19: ...trolleys into the main profile as shown in the diagrams Adjust the top wheel in the 2 trolleys as shown in the diagrams Fig 7 9 DET 7 9 1 Fig 7 7 Fig 7 8 7 2 INTRODUCE TROLLEYS INTO MAIN PROFILE Fig 7 6 Tools Nuts bolts DIN7380 6x10 DIN6798 M 6 Fig 7 5 7 1 3 Lock hooks assembly OPENING TO THE LEFT OPENING TO THE RIGHT 7 1 3 Lock hooks assembly Fig 7 5 Fig 7 5 7 6 Fig Fig 7 6 ...

Page 20: ...DIN7380 6x10 DIN6798 M 6 Fig 7 13 7 3 3 Arms on trolleys assembly Fig 7 10 7 3 1 Cut arms 7 3 DRAGGING ARMS ASSEMBLY 7 3 2 Arms on trolleys assembly OPENING TO THE LEFT OPENING TO THE RIGHT 7 3 2 Arms on trolleys assembly Cut arms as shown in diagram Fig 7 10 Fig 7 11 Fig 7 12 7 11 DET Screw anchors to arms as shown in diagram 7 12 DET OPENING TO THE RIGHT ...

Page 21: ...and trolley 1 as shown in the diagram 7 14 See correct layout once the trolley and arm assembly is complete 7 15 Fig Fig DIN7380 6x10 DIN6798 M 6 Nuts bolts Nuts bolts Fig 7 4 FINAL LAYOUT OF TROLLEYS ARMS OPENING TO THE LEFT OPENING TO THE RIGHT OPENING TO THE LEFT 7 16 Fig 7 15 Fig 7 16 Fig ...

Page 22: ...des position On the side of the fixed leaf as shown in the diagram 8 1 Mark the floor using the metal guide as a template 8 2 Position the guide as shown in the diagram 8 3 Drill the floor in accordance with the marks 8 4 Fig Fig Fig Fig 8 1 1 Mark and drill the floor 8 1 FLOOR GUIDES ASSEMBLY 8 GUIDE AND SLIDING LEAF ASSEMBLY ...

Page 23: ...he top of the sliding leaves DET 8 7 1 Fig 8 7 Nuts bolts DIN6923 M8 DET 8 7 1 DET 8 7 1 x2 8 2 1 Insert the screws into the square section bars 8 2 SLIDING LEAVES ASSEMBLY Insert rawlplugs intro the holes which have been drilled Assemble guide as shown in the diagrams Fig 8 6 Fig 8 5 Fig 8 6 Fig 8 5 8 1 2 Screw in the guides ...

Page 24: ... 9 Fig 8 8 Fig 8 11 a Support the leaf on the guide as shown in the diagram Insert the screws so they hang from the trolleys as shown in the diagrams Position the trolleys with respect to the door leaves as shown in the diagrams Fig 8 11 Fig 8 10 Fig 8 9 Fig 8 8 8 2 2 Leaves hanger ...

Page 25: ...f sliding leaves as shown in the diagram To adjust height of sliding leaves 1 Loosen screws as shown in the diagram 2 Screw adjustment nut as shown in the diagram Fig 8 14 Fig 8 13 Fig 8 12 Fig 8 14 Fig 8 13 8 2 3 Adjust sliding leaves Frame spacing table D20 F20 R20 T20 E20 6 T35 D35 S40 6 I30 15 C44 S44 26 Fig 8 11 a ...

Page 26: ...t to the main profile as shown in the diagrams 9 3 9 4 DIN7380 6x14 Spring Nut M6 Fig Fig Nuts bolts Nuts bolts Fig 9 1 3 Screw in the drive unit 9 1 2 Layout of components PL 1000 Fig Fig Fig Fig OPENING TO THE RIGHT PL 1000 OPENING TO THE LEFT PL 1000 9 1 1 Insert nuts in main profile 9 1 DRIVE UNIT ASSEMBLY 9 DRIVE UNIT BELT ANCHOR ASSEMBLY ...

Page 27: ...mm there is no need to disassemble the drive unit Fig 9 8 Fig 9 7 Fig 9 7 Unscrew motors M1 M2 and electronics unit E from the drive assembly Screw M1 onto the extension plate and M2 and E in the drive unit plate as illustrated Note Only carry out this operation where PL 1000 mm Where PL 1000 mm there is no need to disassemble the drive unit Fig 9 6 Fig 9 5 Fig 9 6 Fig 9 5 9 1 4 Drive unit with ex...

Page 28: ...eme for opening to the right C11 according to table fig 10 15 OPENING TO THE LEFT PL 1000 Assembly scheme for opening to the left C11 according to table fig 10 15 Fig 9 10 Fig 9 9 9 1 7 Placement of drive unit Screw the drive unit to the main profile as shown in the diagrams Fig 9 4 Fig 9 3 9 1 6 Screw in the drive unit 9 1 5 Layout of components PL 1000 ...

Page 29: ...Cut belt Drive unit opening to the right Drive unit opening to the left Cut belt Fig 9 16 Fig 9 16 Fig 9 15 Fig 9 13 Fig 9 12 Cut the belt as shown in the diagram See table for belt length Place the anchors along the belt as shown in the diagram For C11 length see table Attach anchors to arms as shown in diagram Fig 9 16 Fig 9 15 Fig 9 15 Fig 9 13 Fig 9 15 Fig 9 12 9 2 BELT ASSEMBLY ...

Page 30: ...g 10 2 Fig 10 1 Insert nuts in main profile in the positions shown in the diagrams Fig 10 5 Fig 10 4 Nuts bolts Spring Nut M6 10 2 1 Insert nuts 10 2 BRACKETS Assemble bottom and front cover as shown in diagrams Fig 10 2 Fig 10 1 10 1 BOTTOM AND FRONT COVER PRE ASSEMBLY 10 COVER ASSEMBLY ...

Page 31: ...10 6 Assemble the snap on clips x4 to the top element cover as shown in the diagrams Fig 10 11 Fig 10 10 10 3 2 Snap on clip assembly Fig 10 8 10 3 1 Top cover assembly Mount brackets x4 onto the main profile as shown in the diagrams Fig 10 7 Fig 10 6 10 2 2 Brackets assembly 10 3 COVER ASSEMBLY Position top cover as shown in the diagram Fix x4 the brackets as shown in the diagram Fig 10 9 ...

Page 32: ...ANUAL 32 Fig 10 14 Fig 10 13 Fig 10 12 Assemble bottom cover onto brackets as shown in the diagram Fix bottom cover as shown in the diagram Close front cover as shown in the diagram Fig 10 14 Fig 10 13 Fig 10 12 10 3 3 Bottom and front cover assembly ...

Page 33: ...R INSTALLATION MANUAL 33 DET 10 15 2 DET 10 15 1 DET 10 15 2 DET 10 15 1 Fig 10 15 Nuts bolts CE PLUS 4 2X13 Screw end covers to both ends of the cover as shown in the diagrams DE 10 15 2 DE 10 15 1 Fig 10 15 10 3 4 Side caps assembly ...

Page 34: ...0 5 at a distance 30mm from the end of the bottom cover as shown in the diagram Make the hole in the centre of the bottom cover AT 2 as shown in the diagram Fig 11 5 Fig 11 4 Open front cover Release the bracket attachments for the bottom cover Remove the bottom cover and the front cover Fig 11 3 Fig 11 2 Fig 11 1 11 1 REMOVE FRONT AND BOTTOM COVER 11 MANUAL UNLOCK ASSEMBLY ...

Page 35: ...ckets rotate 90º as shown in the diagram Fig 11 7 Screw the piece to the lock as shown in the diagram Ensure that the actuator is between the two projections as shown in the diagrams DET 11 7 1 Fig 11 7 Fig 11 6 Nuts bolts Nuts bolts DIN7380 6x10 DIN6798 M 6 11 2 1 Lock attachment piece assembly 11 2 MANUAL UNLOCK ASEMBLY 11 8 Fig Fig 11 2 2 Bottom and front cover assembly Fig 11 7 ...

Page 36: ...rests in the slot and is centred with respect to the hole in the bottom cover as shown in the diagram DET 11 9 1 Fig 11 10 Fig 11 9 DET 11 9 1 DET 11 9 1 Fig 11 9 11 2 3 Toothed piece assembly Insert the actuator and securing washer as shown in the diagrams Ensure that the actuator is oriented as shown in the diagram DET 11 11 1 Fig 11 11 Fig 11 11 11 2 4 Unlocking actuador assembly ...

Page 37: ...sm is operated manually the lock s bolts open and close as shown in the diagram See the operation of the unlocking mechanism as shown in the sequence Fig 11 16 Fig 11 15 Insert the toothed cylinder as shown in the diagrams Push it in all the way until it snaps into place Fig 11 14 Fig 11 13 11 2 5 Toothed cylinder assembly 11 2 6 Operate lock manually ...

Page 38: ...side key switch Side screen sensor Emergency push button Photocells Manusa Planar Radar Manusa infrared sensor White Auxiliary exit of 12V Receiver green Emitter yellow Grey Yellow White Black White Black White Black White Black White Black White Black Grey Grey Yellow White Grey 12 1 MAIN WIRING DIAGRAM 12 WIRING ...

Page 39: ...3 4 5 6 7 8 9 10 1 2 3 3 4 4 5 6 7 8 9 10 Single phase 220V 240V 6 A Using the Optima selector 1 Check that leaves are in closed position before running the self adjustment procedure 2 Navigate to the technical service functions and select parameter F8 see the Optima selector manual 3 The self adjustment process will end after the door opens two consecutive times and monitors the performance of th...

Page 40: ... button 4 repeatedly while keeping button 2 pressed to access the technical service functions 3 Press button 2 or 4 repeatedly until option SELF ADJUSTMENT is shown on the display Then confirm your option press ing button 3 4 Message RUN SELF ADJUSTMENT will appear on the display Press 3 to confirm 5 The self adjustment process will end after the door opens two consecutive times and monitors the p...

Reviews: