background image

ARP Odyssey & Avatar LED Slider

Installation Manual

Summary of Contents for LED slider

Page 1: ...ARP Odyssey Avatar LED Slider Installation Manual...

Page 2: ...electronics please seek out the skills of a qualified technician who can install this kit The installation should take between 4 and 8 hours in most cases Take your time and always check twice before...

Page 3: ...ed For Installation 1 Remove all slider caps from the ARP then remove all PCBs from chassis Desolder all old CTS sliders and remove them from the boards Always be sure not to damage PCB traces when do...

Page 4: ...gether and all GND pins together It is easy to make a mistake and reverse the polarities when using the longer cables Be sure to double check your work before you solder Figure 2 Slider Wiring Assembl...

Page 5: ...gently moiving them or heating up the tack solder joint Don t hold the soldering iron tip to the tack solder joint for more than 2 4 seconds Too much heat can cause the slider adapter PCB pins to bec...

Page 6: ...ht if the LFO on the ARP is running In this case we will only be running the LED circuit on the sliders This step can be done after you have wired the 5V LED supply into place Using a preferably non c...

Page 7: ...Figure 5 Slider Assembly Powered LED brightness being adjusted on each slider...

Page 8: ...Figure 6 ARP Odyssey 2800 Board A Installed...

Page 9: ...Figure 7 ARP Odyssey 2800 Board B Installed Note that this wiring is different from the suggested method as shown in PCB drawings below...

Page 10: ...Figure 8 ARP Odyssey 2800 Board C Sliders Installed...

Page 11: ...GND V FEMALE CONNECTOR 1MD Drawing 1 ARP Odyssey 2800 Suggested Wiring Diagram BOARD A...

Page 12: ...GND V GND V 100KB 100KB 100KB 100KB GND V GND V GND V GND V SRC MALE CONNECTOR TO BD A FEMALE CONNECTOR TO BD C 100KB 100KB 100KB 100KB 100KB 100KB 100KB 100KD 100KD 100KD 100KD 100KD 100KD 100KD 1MD...

Page 13: ...1MD GND V 1MD GND V 100KD GND V 100KD GND V 100KD GND V 100KB GND V 100KB GND V 100KB GND V 100KD GND V 1MD GND V 1MD GND V 100KB GND V 1MD MALE CONNECTOR TO BD B FEMALE CONNECTOR TO 5V POWER SUPPLY D...

Page 14: ...e same as the transformer on the ARP Find a location near the transformer where the ballast can be mounted Use the mounting template and make starter marks using a punch Drill the mounting holes for t...

Page 15: ...Figure 11 Marking Mounting Holes for Drilling Figure 12 Power Supply Mounted In Case...

Page 16: ...witch Figure 13 AC Mains Wiring for LED Ballast 6 The ground black wire of the 5V ballast must be connected to the ground of your ARP s power supply This is done to provide a ground reference to the b...

Page 17: ...Figure 14 Extra Grounding Wire 5V Power Wiring Figure 15 Finished LED Ballast Wiring...

Reviews: