Powador-piccoLOG

Operating Manual

  

English translation of    

 

   German original

Summary of Contents for Powador-piccoLOG

Page 1: ...Powador piccoLOG Operating Manual English translation of German original...

Page 2: ......

Page 3: ...s guide 7 2 Safety 8 2 1 Proper use 8 2 2 Protection features 8 3 Transportation and Delivery 9 3 1 Delivery 9 3 2 Scope of delivery 9 3 3 Disclaimer 9 4 Product Details 10 4 1 Functional Description...

Page 4: ...ador web Public Portal 17 5 9 Powador piccoLOG Device Manager software 17 6 Technical Data 19 7 Operation 20 7 1 Overview of operating controls 20 7 2 LED indicators 20 7 3 Power control 21 7 4 Factor...

Page 5: ...e all assembly and installation instructions for components and other parts of the system These instructions are delivered together with the respective components and other parts of the system Storing...

Page 6: ...ing may lead to serious bodily injury or death CAUTION Low risk hazard Failure to observe this warning will lead to minor or moderate bodily injury CAUTION Risk of damage to property Failure to observ...

Page 7: ...Instructions Prerequisite s for the step s optional Carry out the next step Additional steps if applicable Result of the step s optional b Multi step instructions that must be carried out in a fixed s...

Page 8: ...als and signal strengths Only suitable for installation indoors For installation in outdoor areas or dusty environments the device must be encased in a protective housing 2 2 Protection features Do no...

Page 9: ...3 3 Disclaimer KACO new energy GmbH accepts no liability for damages that may arise from a failure to follow the instructions in the operating manual This shall apply in particular to damage that ari...

Page 10: ...logger enables the implementation of simplified energy management 4 2 Device overview S C A N Q U I T C O M 10 9 8 6 7 2 1 3 4 5 11 1 2 3 P O W A D O R p i c c o L O G M A D E I N G E R M A N Y Figure...

Page 11: ...live components can result in electrical shock burns or death Installation should only be carried out by an electrician Check the cable installation points Do not drill into cables CAUTION Overvoltag...

Page 12: ...12 Operating manual Powador piccoLOG_EN 5 2 Interface overview 1 2 3 4 5 Figure 2 Interface overview 1 Micro USB 2 Power connection 3 RS485 422 for inverters RJ12 jack 4 Ethernet port 5 Port for ripp...

Page 13: ...ccoLOG_EN Page 13 5 3 Wall mounting 80 mm 1 I 2 3 MENU ACTION X 500 mm 6 mm x 20 mm Figure 3 Wall mounting Mounting the device on the wall Drill holes Insert wall plugs Screw the screws 5mm into the w...

Page 14: ...ils on bus configuration To connect use a ready made connection cable or manufacture one according to the above pin configuration We recommend the use of UNITRONIC Li2YCYv TP cables produced by LappKa...

Page 15: ...Figure 5 Connect ripple control receiver NOTE To connect use a ready made connection cable or a standard Ethernet cable When using an Ethernet cable cut off the connector at one end and manufacture th...

Page 16: ...ter automatically assigns client s IP addresses when DHCP is activated on the network Automatic configuration Connect the device to the network via the Ethernet port using an Ethernet cable The device...

Page 17: ...rwise the device will not be properly recognised by the system First install the software and the drivers then connect to the PC Following incorrect installation install the device on the system after...

Page 18: ...he PC To fix this problem follow these steps Open Device Manager 1 Control Panel 2 System 3 Hardware 4 Device Manager Installing Reinstalling device drivers 1 Right click on piccoLOG under Other devic...

Page 19: ...s IP21 Weight 203 g Ambient conditions Operating temperature 0 to 55 C Storage temperature 20 to 65 C Cables and wires Cable types Bus cable RS485 422 twisted and shielded Li2YCYv TP 2 x 2 x 0 5 mm21...

Page 20: ...2 LED indicators LEDs Off Flashing Illuminated Data logger out of service Data logger is currently in booting process Data logger is ready for use No inverter connected recognised Inverter error disc...

Page 21: ...vice is limited and a device scan is not possible 1 Figure 8 Flick Power Control switch Activate Power Control 1 Open protective cover 2 Turn Power Control switch left to the ON position 3 Close prote...

Page 22: ...at level 2 30 of PNenn Power reduction at level 3 0 of PNenn DHCP active 7 5 PC software mode NOTE As soon as the device is connected to the PC via the accompanying USB cable the USB mode is automatic...

Page 23: ...the RESET 1 button Press RESET 1 button using a paper clip The device will restart 7 7 Resetting the device 7 7 1 Reset on factory settings NOTE All collected data will be deleted during the reset The...

Page 24: ...are update for example there is still the possibility to switch back to the basic firmware and install a specific firmware NOTE All collected data will be deleted during the reset The data collected a...

Page 25: ...e 25 Error messages 8 Error messages 3 Figure 10 Error messages 1 Operating LED 2 Inverter LED 3 COM LED Errors are indicated by the flashing the Operating LED and the Info LED In addition an audio si...

Page 26: ...ix the error using the help table below please contact the KACO new energy GmbH service team LEDs Off Flashing Illuminated Operation Check the mains supply WR 1 WR 2 WR 3 Check wiring IP address Read...

Page 27: ...error An audio signal sounds The error is acknowledged Afterwards a test is carried out that queries all possible errors in order to report any connected errors that remain NOTE In order to prevent an...

Page 28: ...Tel 49 7132 3818 0 Fax 49 7132 3818 703 info kaco newenergy de www kaco newenergy de The text and figures reflect the current technical state at the time of printing Subject to technical changes Erro...