background image

ARA DOCK4

User Manual V1.0

 

P

ion

eering Gas Sensing Technology. 

ionscience.com

 

Distributed by:

91-

91-92 Shrivenham Hundred Business Pa

Watchfield, Oxfordshire, SN6 8TY

Tel:  

Email:

 

Web:  

01367 899558

[email protected]

shawcity.co.uk

Summary of Contents for shawcity ARA DOCK4

Page 1: ...er Manual V1 0 Pioneering Gas Sensing Technology ionscience com Distributed by 91 91 92 Shrivenham Hundred Business Pa Watchfield Oxfordshire SN6 8TY Tel Email Web 01367 899558 info shawcity co uk sha...

Page 2: ...rging 8 Calibration Gas Installation 8 Set Ventilation Flow Path 9 Operate the ARA DOCK4 10 Turn on off the ARA DOCK4 10 Set gas detectors on Test Bays 11 Start Tests 11 Management of the ARA DOCK4 12...

Page 3: ...at any time and without any notice to remove amend or vary any of the content which appears in this manual Symbols WARNING USED TO INDICATE DANGER WARNINGS WHERE THERE IS A RISK OF INJURY OR DEATH Ca...

Page 4: ...exercise due care and follow the appropriate regulations when disposing Always adhere to local regulations and procedures when disposing of the equipment ION Science Ltd offers a take back service Ple...

Page 5: ...two power sources A 12V DC mains power supply and an internal rechargeable battery The internal rechargeable battery provides approximately 5 hours of continuous operation based on 4 ARA s inserted T...

Page 6: ...coupler Used to supply fresh air Exhaust Outlet 1 8 Hose Barb coupler Gas and fresh air used in the test are exhausted here Calibration Gas Pressure Gauge Gauge for checking Gas remaining Max 1 500 p...

Page 7: ...on IrDA communication Sensors Audio and optical Tests Bump Calibration Data Transfer Audible alarm visual alarm Gases Available H2S 25ppm CO 100ppm O2 18 SO2 10ppm Adjustable Gas Cylinder Compatible w...

Page 8: ...l gas for calibrations The equipment must be attached to a venting system or be used in a well ventilated area Charging The ARA DOCK4 is powered by External 12Vdc Adapter and internal rechargeable bat...

Page 9: ...RNING Ensure that all calibration gas cylinders are in good condition WARNING Ensure that all calibration gas cylinders contain enough gas WARNING This equipment uses toxic gas for calibrations The eq...

Page 10: ...ARA DOCK4 If it is powered the Power Button will light up according to the ARA DOCK4status 1 The ARA DOCK4 can be operated when the Power Button lights up green 2 The ARA DOCK4 will automatically turn...

Page 11: ...alibration Green Calibrates the detectors measurement accuracy against the applied gas 1 After gas detectors are installed press Bump Test Button of Calibration Button to start tests 2 A bump test wil...

Page 12: ...s an ethernet and USB port Either ports can be used to connect to a PC Dock4Manager Software Features Change gas configurations If a calibration gas cylinder of different gases or concentrations is on...

Page 13: ...of the equipment 3 Do not attempt to disassemble adjust or service the equipment unless instructions are provided to perform a procedure or a component is listed as a user replaceable component in the...

Page 14: ...eplace the empty gas cylinder Gas cylinder does not fit to tubing and cannot be installed to ARA DOCK4 Inspect the tubing and replace with new one if it is damaged Power Buttons is blinking red Check...

Page 15: ...ce com in Email kschari ionscience com ION Science Inc USA Office Tel 1 877 864 7710 Web https ionscience com usa Email info ionscienceusa com ION Science Italy Italy Office Tel 39 051 0561850 Web www...

Reviews: