background image

JAN 2022 REV. C  

EAZ0080V72A 

Installation, Operation & Maintenance Manual 

R

OLLING 

J

ACK 

F

OR 

A

LIGNMENT 

L

IFT 

EELS904A

 

&

 

EELS905A

 

 

 

ADJUSTABLE AIR-HYDRAULIC ROLLING Jack Beam 

CAPACITY: 7000 & 7500LBS 

 

 

309 Exchange Avenue, Conway, AR 72032 

 TEL:  800-225-5786 

IMPORTANT

:

  

 

READ THIS MANUAL COMPLETELY BEFORE 

INSTALLING or OPERATING JACK 

 

Summary of Contents for EELS904A

Page 1: ...enance Manual ROLLING JACK FOR ALIGNMENT LIFT EELS904A EELS905A ADJUSTABLE AIR HYDRAULIC ROLLING Jack Beam CAPACITY 7000 7500LBS 309 Exchange Avenue Conway AR 72032 TEL 800 225 5786 IMPORTANT READ THI...

Page 2: ...erican National Standard for Automotive Lifts Safety Requirements for Operation Inspection and Maintenance and the Employer shall ensure that the lift maintenance personnel are qualified and that they...

Page 3: ...equipment Installation of lifts shall be performed in accordance with ANSO ALI ALIS Safety Requirements for Installation and Service of Automotive Lifts For additional safety instructions regarding l...

Page 4: ...le Shooting 13 10 0 Jack Beam Assembly Total Exploded View 14 11 0 Jack Beam Assembly Parts List 15 12 0 Jack Beam Assembly Arm Exploded View 16 13 0 Jack Beam Assembly Arm Part List 16 14 0 Jack Beam...

Page 5: ...7 5mm 3 4 18 6mm F Maximum Raised Height above Deck Surface w pad 20 507mm 16 1 2 419 6mm G Width Between Decks 40 1016mm 40 5 8 1032mm H Lift Height 7 3 4 196mm 7 3 16 182mm I Base Width 32 1 4 819mm...

Page 6: ...nways This number is dependent on the number and size of stack adapters used For each stack adapter minus the length of each from 12 Failure to comply can result in vehicle damage and or personal inju...

Page 7: ...and roll freely c Tighten roller adapter jam nuts 2 Attach recoil hose to the bulkhead fitting at the rear of each Jack Beam and then other ends to the T fitting on lift a The Jack Beam is shipped pre...

Page 8: ...hydraulic leaks 5 See sections 5 0 Raising the Jack Beam and 6 0 Lowering the Jack Beam for operation instructions 6 Adjust the lock pawl handle a Confirm the lock pawl is engaged properly on the thi...

Page 9: ...Press the PUMP end on the air hydraulic pump and hold until jacking Beam is at full working height 3 As lift travels up Ensure the mechanical safety falls into place at all safety positions Check sys...

Page 10: ...t familiar with the controls by running the Jack Beam through a few cycles before loading vehicle on lift 7 0 Storage Position of Jack Beam In order to allow for adequate vehicle drive on clearance 1...

Page 11: ...r the short or long stack adapters NOTE Use the same length of stack adapter on each lifting arm 8 NOTE Lift vehicle at vehicle manufacturer s recommended pickup points only Please refer to ALI LP GUI...

Page 12: ...air source clean and make certain that an air filter is used to keep dirt out of the air motor To maintain a clean shop air supply an FRL oil lube filter and regulator should always be in good working...

Page 13: ...orrect restriction Contact customer service to have pump serviced Pump runs but will not lift to full height Pump low on fluid Pump vent closed Lower Jack Beam and check fluid level Replenish if requi...

Page 14: ...14 of 22 JAN 2022 REV C EAZ0080V72A 10 0 Jack Beam Assembly Total Exploded View...

Page 15: ...END TOP FRAME EAM0194V35A 16 1 HYDRAULIC CYLINDER TOP PIN EAM0194V67A 17 2 HYDRAULIC PUMP MOUNTING BRACKET EAM0194V69A 18 2 STACK PAD ADAPTER 3 EAM0194V61A 19 2 STACK PAD ADAPTER 6 EAM0194V62A 20 2 GU...

Page 16: ...ded View 13 0 Jack Beam Assembly Arm Part List ITEM QTY DESCRIPTION PART 1 1 TOP FRAME WELDMENT EAS2242V10A 2 2 PLATED STACK PAD EAS2242V14A 3 2 JACK BEAM ARM WELDMENT EAS2242V12A 4 2 RUBBER BLACKET A...

Page 17: ...sor Exploded View 15 0 Jack Beam Assembly Scissor Part List ITEM QTY DESCRIPTION PART 1 2 SHIM CENTER PIN EAM0194V65A 2 1 PIN SCISSOR CENTER EAM0194V30A 3 4 NYLON SLIDE BLOCK EAM0194V31A 4 1 SCISSOR O...

Page 18: ...Assembly Adapter Part List ITEM QTY DESCRIPTION PART 1 1 ADAPTER WELDMENT EAS2242V21A 2 2 ROLLER ASSEMBLY EAS2242V17A 3 2 SHOULDER SCREW M12 EAM0194V54A 4 2 SLIDING STEM EAM0194V55A 5 2 SPRING 45 EAM0...

Page 19: ...5A 2 2 ROLLER ASSEMBLY EAS2242V17A 3 2 SHOULDER SCREW M12 EAM0194V54A 4 2 SLIDING STEM EAM0194V55A 5 2 SPRING 45 EAM0194V59A 6 2 WASHER EAM0194V58A 7 2 ROLLER AND SPRING ASSEMBLY INCLUDING ITEMS 2 3 4...

Page 20: ...of 22 JAN 2022 REV C EAZ0080V72A 20 0 Maintenance Schedule Records of all lift maintenance and operator training should be recorded in the following table Maintenance and Training Performed Date By No...

Page 21: ...21 of 22 JAN 2022 REV C EAZ0080V72A Maintenance and Training Performed Date By Notes Make copies of this form as required...

Page 22: ...date total exploded view and part list on page 14 and 15 Add arm scissor and adapter exploded view and part list on page 16 17 18 and 19 2 8 21 RG C DG07958 Change specifications of width between runw...

Reviews: